SITE INFORMATION
Site Name
Memphis Regional Megasite
Environmental Field Office (EFO)
Jackson
County
Haywood
Other Counties
Within MS4
Description
The Project consists of the realignment of approximately 1,700 feet of Fredonia Road south of the intersection with Keeling Road, north of Interstate 40 and south of State Route 79, southeast of the Town of Stanton within Haywood County, Tennessee.
Location
101 Fredonia Loop
City
Stanton
Zip
38069
Site Map
5000 ft
© 2022 Oracle Corporation
Terms
Map data © 2021 HERE
DWR Permits at this Site
Permit No
Permittee
Project Name
Type
Action
Effective Date
Expiration Date
NR1302.075
State of Tennessee - Department of General Services (DGS)
Wastewater force main and on-site water distribution system - Memphis Regional Megasite
ARAP
Withdrawn
-
-
NRS08.260
Haywood County
-
ARAP
Withdrawn
-
-
NRS13.248
State of Tennessee - Department of General Services (DGS)
Memphis Regional Megasite - Utility Crossing – Multiple Streams and Wetlands
ARAP
Withdrawn
-
-
NRS17.054
State of Tennessee - Department of General Services (DGS)
Memphis Megasite - Installation of 18 inch HDPE Force Main to the Mississippi River
ARAP
Inactive
5/1/2018
4/30/2023
NRS18.287
State of Tennessee - Department of General Services (DGS)
Memphis Regional Megasite Force Main 3
ARAP
Inactive
-
-
NRS21.238
Ford Motor Company
Blue Oval City
ARAP
Active
3/22/2022
3/21/2027
NRS22.127
Memphis Regional Megasite Authority
Memphis Regional Megasite, Site Water Piping and Sanitary Sewer Force Main
ARAP
Inactive
9/29/2022
9/28/2027
NRS23.159
Tennessee Department of Transportation (TDOT)
PIN 132709.00, PE #R4S222-S1-002
ARAP
Active
10/16/2023
10/15/2028
NRS23.237
Tennessee Department of Transportation (TDOT)
24S222-S1-003; PIN 132132.04 (Project Blue Oval)
ARAP
Active
4/23/2024
4/22/2029
NRS24.151
Becknell Services, LLC
Fredonia Road Improvement Project
ARAP
Complete
-
-
row(s) 1 - 10 of 24
Next
Documents at this Site
Search All Documents
FileNet Documents
View
Permit No
File Type
Description
Document Date
TN0082368
Email
12/13/24 Response from Ford regarding complaint #134499
12/13/2024
TN0082368
Letter
TN0082368 Email chain with response from Ford per 11/1/24 letter with associated attachments
12/6/2024
NRS24.151
Letter
Applicant Letter of Responsibility
11/26/2024
NRS24.151
Draft Permit
Draft Permit
11/26/2024
NRS24.151
Public Notice Document
Public Notice Document
11/26/2024
NRS24.151
Email
Public Notice Email
11/26/2024
NRS24.151
Addendum
Revised debit calculation
11/25/2024
TN0082368
Letter
TN082368 Ford response to TDEC's 11/1/24 letter
11/22/2024
TN0082368
Letter
TN0082368 Signatory Authority Letter regarding site inspections being delegated to Blake Newbill.
11/22/2024
NRS24.151
Letter
Mitigation bank preliminary credit reservation letter
11/19/2024
TN0082368
Letter
TN0082368 Follow-up letter to July 19 2024 CEI
11/1/2024
NRS24.151
Addendum
Revised SQT Data
10/15/2024
NRS24.151
Addendum
RAI Response and Revised SQT Data
10/15/2024
-
Letter
Temporary Water Plant Approval
12/8/2023
-
Email
email with spill response report
11/21/2023
row(s) 1 - 15 of 58
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Complaints on this Site
View
Received
Concerning
Status
11/20/2024
Stormwater - Construction
Issue Resolved
9/26/2023
Pollution / Spills / Illicit Discharge
Issue Resolved
7/7/2023
Stormwater - Construction
Referred to other Agency
5/26/2011
Other
Closed
row(s) 1 - 4 of 4
Inspections at this Site
Inspection Date
Permit No
Permittee Name
Type
Result
05-DEC-2023
-
-
Construction Inspection - Site 1
In Compliance
12-AUG-2009
-
-
Reconnaissance (RI)
In Compliance