TVA Wheeler-Maury 161 kV Reconductor
Columbia
Lawrence
The reconductor project begins at Wheeler in Lawrence County, AL and travels north to the Maury Substation in Columbia TN. The route stretches for 63 miles over rural and urban areas.
Tennessee state line in Lawrence County, Lat. :35.001, Long.: -87.319, travels north to the Maury Substation in Giles County, Lat.: 35.425, Long.:0-87.102
Columbia
38457

Site Map

DWR Permits at this Site

NRS22.121Tennessee Valley Authority (TVA)TVA Wheeler-Maury 161 kV ReconductorARAPActive8/30/20228/29/2027
TNR190978Tennessee Valley Authority (TVA)TVA Wheeler - Maury 161 kV ReconductorCGPInactive9/2/2009 -
TNR192185Tennessee Valley Authority (TVA)Wheeler-Maury 161-kV Transmission LineCGPInactive1/23/20239/30/2026

Documents at this Site

View
TNR192185Notice of TerminationRCVD VIA EMAIL 03-OCT-24: NOT by Kristin Spearman10/3/2024
TNR192185EmailNOT Acknowledgement10/3/2024
NRS22.121EmailStatus update6/6/2024
TNR192185EmailRCVD 04-JUN-24: email re: reduced inspection frequency from Joe Melton6/4/2024
TNR192185FormREF VIA EMAIL 02-FEB-23: form re: proof of payment of $3000 from Joe Melton2/2/2023
TNR192185Notice of Coverage (NOC)Wheeler-Maury 161-kV Transmission Line NOC1/20/2023
TNR192185SWPPPWheeler Maury 161-kV1/17/2023
TNR192185Notice of Intent (NOI)RCVD VIA EMAIL 05-JAN-23: CGP NOI by Douglas Bailey1/5/2023
NRS22.121PermitPermit Issued 8/30/2022
NRS22.121PermitPermit issued 8/30/2022
NRS22.121EmailFinal Permit Email8/30/2022
NRS22.121LetterCover letter8/30/2022
NRS22.121Public Notice DocumentProof of ads run 7 29 22 or prioir 8/3/2022
NRS22.121Public Notice DocumentProof of PN Signs posted 7 22 22 7/25/2022
NRS22.121Public Notice DocumentPublic Notice Document6/28/2022