Skip to Main Content
  • Site Information

SITE INFORMATION

Tennessee Valley Authority (TVA) - Bull Run Fossil Plant (BRF)
Knoxville
Anderson
TNS075108
Electric Services. TNR191011-Proposed project is approximately 6 acres within the Bull Run Fossil Plant Site's 750 acres. Nonmetallic Minerals
1265 Edgemoor Road
Clinton
37716

Site Map

DWR Permits at this Site

NR0903.076Tennessee Valley Authority (TVA)TVA Bull Run Fossil PlantARAPInactive4/29/20094/30/2010
NR1503.098Tennessee Valley Authority (TVA)Bull Run Fossil Plant Rail Loop Disposal AreaARAPInactive10/27/20154/6/2020
NR2203.096Tennessee Valley Authority (TVA)Bull Run Fossil Plant Seep MitigationARAPInactive5/2/20224/7/2025
NRS05.332Tennessee Valley Authority (TVA) - ARAPInactive9/8/200510/31/2007
NRS07.192Tennessee Valley Authority (TVA)TVA-Bull Run Fossil PlantARAPInactive - 8/28/2012
NRS08.190Tennessee Valley Authority (TVA) - ARAPInactive - 8/10/2011
NRS10.253Tennessee Valley Authority (TVA)TVA Bull Run Fossil PlantARAPInactive10/15/201010/14/2015
NRS12.212Tennessee Valley Authority (TVA)Bull Run Fossil Plant - Maintenance Activities - Culvert Replacement Project at Worthington BranchARAPInactive11/5/201211/4/2017
NRS13.015Tennessee Valley Authority (TVA)Culvert removal and stream restorationARAPInactive2/5/20132/4/2015
NRS15.291Tennessee Valley Authority (TVA)Bull Run Fossil Plant - Rail Loop Disposal Area - Replace Existing Outfall Pipes to Discharge Surface Storm Water Runoff from Railroad Loop Disposal Area at Clinch River and Melton Hill ReservoirARAPActive10/26/20154/6/2021

Documents at this Site

View
TN0005410Letterconcurrence with proposed modifications to Phase 1 decanting, details regarding Phase 2 dewatering of the Main Ash Pond with some reccomendations and restrictions8/2/2024
TN0005410ReportRCVD VIA EMAIL 27-JUN-24: report re: annual seepage report by Wade Hawkins6/27/2024
TN0005410LetterRCVD VIA EMAIL 06-JUN-24: letter re: Phase 1 revision and Phase 2 submittal by Paul Pearman6/6/2024
TNR053185Inspection ReportInspection Report4/3/2024
TN0005410LetterRCVD VIA EMAIL 26-MAR-24: letter re: cessation of coal combustion and associated NPDES renewal app update by Paul Pearman3/26/2024
TNR191722LetterAnnual Maintenance Fee Notice Letter3/21/2024
NR2203.096Notice of TerminationNotice of Termin2/21/2024
TNR191563Notice of TerminationRCVD VIA EMAIL 21-FEB-24: NOT by Scott Turnbow2/21/2024
TN0005410Inspection ReportTVA - BRF CEI Report 2/14/20242/15/2024
TN0005410ReportRCVD VIA EMAIL 26-JAN-24: report re: ELG Related Projects Annual Report by Wade Hawkins1/26/2024
TN0005410EmailBull Run Main Ash Pond Decanting - Approval of Proposed Changes1/16/2024
TN0005410EmailMonday pumping was initiated by on-site staff who had not recalled the planned halt in operations, and ran for approximately 3 hours. Effluent limits/triggers are monitored remotely, and discharge met all requirements in accordance with the decanting plan12/20/2023
TNR053185Monitoring Report2023 Annual Stormwater Monitoring Report11/17/2023
TN0005410ApplicationRCVD VIA EMAIL 01-SEP-23: update to app re: gypsum harvesting stormwater treatment plan revision 1 by Paul Pearman9/1/2023
TNR053185Monitoring Report2023 Annual Stormwater Monitoring Report8/28/2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Complaints on this Site

no data found

Inspections at this Site

Permittee Name
03-APR-2024- - Industrial Stormwater Unpermitted Site (CWA)In Compliance
03-APR-2024TNR053185Tennessee Valley Authority (TVA)Stormwater Non-Construction Non-SamplingIn Compliance
29-MAR-2024TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance
04-MAR-2022TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance
20-DEC-2019TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance
28-FEB-2018TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance
28-FEB-2018TNR053185Tennessee Valley Authority (TVA)Stormwater Non-Construction Non-SamplingIn Compliance
03-NOV-2016TNR191563Tennessee Valley Authority (TVA)Stormwater Construction Non-SamplingIn Compliance
24-OCT-2016TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance
19-SEP-2012TNR053185Tennessee Valley Authority (TVA)Stormwater Non-Construction Non-SamplingIn Compliance
19-SEP-2012TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance
19-DEC-2008TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance
28-JUN-2007TN0005410Tennessee Valley Authority (TVA)Compliance Eval (non-sampling) (CEI)In Compliance