Skip to Main Content
  • Site Information

SITE INFORMATION

Cattle Trails Estates
Nashville
Robertson
TNS077810
Installation of 60 inch RCP culvert road crossing encapsulating approximately 200 feet of stream, to access a proposed subdivision.
Greenbriar Cemetery Road
Greenbrier
37073

Site Map

DWR Permits at this Site

NRS20.0623BM, LLCCattle Trails EstatesARAPActive7/1/20204/7/2025
TNR2441783BM, LLCCattle Trails EstatesCGPActive7/6/20209/30/2026

Documents at this Site

View
TNR244178LetterAnnual Maintenance Fee Notice Letter5/23/2024
TNR244178Inspection ReportConstruction Stormwater Non-Sampling Inspection Photo Log (20-MAY-24)5/21/2024
TNR244178Inspection ReportConstruction Stormwater Non-Sampling Inspection Form (20-MAY-24)5/20/2024
TNR244178EmailEmail Correspondence with 3BLM (William McMahan)4/22/2024
TNR244178EmailEmail Correspondence with 3BLM regarding anonymous complaint 4/18/2024
TNR244178Notice of ViolationFailure to maintain sediment basin allowing discharge of sediment into an unnamed tributary of Long Branch9/18/2023
TNR244178EmailNOV correpondence email 9/18/2023
TNR244178Letternotice letter5/19/2023
NRS20.062Letternotice letter4/21/2023
TNR244178Notice of ViolationNOV (Complaint no.122348) Absence and failure erosion prevention and sediment control (EPSC) measures (EPSCs) to prevent untreated, down-gradient stormwater discharges and sedimentation offsite 6/7/2022
TNR244178LetterCGP Notice6/10/2021
TNR244178EmailNOC Notification Email - TNR244178 - 49.68 acres (07-07-20)7/7/2020
TNR244178Notice of Coverage (NOC)NOC - TNR244178 - 49.68 acres (07-07-20)7/7/2020
NRS20.062EmailNOC sent to permittee7/1/2020
NRS20.062PermitFinal permit and cover letter7/1/2020
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Complaints on this Site

View
See Details3/25/2024Stormwater - ConstructionIssue Resolved
See Details8/14/2023Stormwater - ConstructionNOV
See Details5/9/2022Stormwater - ConstructionNOV

Inspections at this Site

Permittee Name
21-MAY-2024TNR2441783BM, LLCStormwater Construction Non-SamplingIn Compliance