Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Site Information
SITE INFORMATION
View in GIS
Site Name
Harvest Point
Environmental Field Office (EFO)
Columbia
County
Maury
Other Counties
Within MS4
Description
This project is a single family subdivision.
Location
957 BEECHCROFT RD
City
SPRING HILL
Zip
37174
Site Map
DWR Permits at this Site
Permit No
Permittee
Project Name
Type
Action
Effective Date
Expiration Date
NR2008.3228
Chapter 2 Development, Inc.
Harvest Point Subdivision
ARAP
Inactive
5/29/2020
4/7/2025
NR2108.3434
D.R. Horton Inc.
Harvest Point Off-Site Sewer Part 2
ARAP
Active
1/6/2022
4/4/2025
NRS16.342
Chapter 2 Development
Harvest Point - 473 acre property fro the proposed development of residential subdivision - Wetlands Fill of 0.99 Acres
ARAP
Withdrawn
-
-
NRS22.148
D.R. Horton, Inc
Harvest Point
ARAP
Active
4/15/2023
4/14/2028
TNR181976
CKP Development, LLC.
The Villages at Harvest Point
CGP
Inactive
10/18/2016
9/30/2026
TNR181976.01
Lennar Homes of Tennessee, LLC
Harvest Point Phase 7 lots 319-343, 421-429, 431-434, and 436
CGP
Inactive
2/5/2018
-
TNR181976.02
Lennar Homes of Tennessee, LLC.
Harvest Point Phase 7 Lots 417-419
CGP
Inactive
12/19/2018
-
TNR181976.03
Lennar Homes of Tennessee, LLC
Harvest Point Phase 7 -Lots 355,415,416
CGP
Inactive
2/20/2019
-
TNR181976.04
Lennar Homes of Tennessee, LLC
Harvest Point Phase 7 Lots 344 thru 354 and 414
CGP
Inactive
4/3/2019
-
TNR181976.05
Lennar Homes of Tennessee, LLC.
Harvest Point Phase 7 Lots 345, 357
CGP
Inactive
2/20/2020
-
row(s) 1 - 10 of 25
Next
Documents at this Site
Search All Documents
FileNet Documents
View
Permit No
File Type
Description
Document Date
TNR182877
Email
Site Assessment
9/9/2024
TNR182877
Report
July Sampling Report
9/9/2024
TNR182877
Inspection Report
Inspection Report
8/20/2024
TNR182877
Email
RAI Response
7/24/2024
TNR182877
Email
RAI for 50acre of disturbance notification
7/24/2024
TNR182489.01
Memo
Receipt
7/22/2024
TNR182489.01
Email
SOS correspondence
7/22/2024
TNR182877
Report
Soil Type info
7/8/2024
TNR182877
Image
KML shapefile for 50 ac exceedance
7/8/2024
TNR182877
Email
50ac exceedance notice and Inspector information
7/8/2024
TNR182489.01
Notice of Intent (NOI)
NOI
6/28/2024
TNR182489.01
SWPPP
Revised SWPPP
6/28/2024
TNR182489.01
Email
Incomplete permit application notice
6/12/2024
TNR182489.01
Email
SWPPP application correspondence
5/28/2024
TNR182489.01
SWPPP
SWPPP
5/28/2024
row(s) 1 - 15 of 210
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Complaints on this Site
View
Received
Concerning
Status
8/26/2024
Erosion / Sediment
Issue Resolved
row(s) 1 - 1 of 1
Inspections at this Site
Inspection Date
Permit No
Permittee Name
Type
Result
20-AUG-2024
TNR182877
D.R. Horton, Inc.
Stormwater Construction Non-Sampling
In Compliance
27-MAY-2021
TNR182321.01
Goodall Homes
Stormwater Construction Non-Sampling
In Compliance
12-AUG-2020
TNR182172
CKP Development, LLC.
Stormwater Construction Non-Sampling
In Compliance
12-AUG-2020
TNR182171
CKP Development, LLC.
Stormwater Construction Non-Sampling
In Compliance
1 - 4