Skip to Main Content
  • Site Information

SITE INFORMATION

Foley Products Company, LLC
Nashville
Williamson
TNS075311
Manufacturer of concrete drainage pipe and related concrete drainage structures.
213 Downs Boulevard
Franklin
37064

Site Map

5000 ft
© 2022 Oracle Corporation    Terms    Map data © 2021 HERE

DWR Permits at this Site

TNG110406Foley Products Company, LLCFranklin PlantRMCPActive11/1/202210/31/2027
TNR053490Sherman-Dixie Concrete Industries, Inc. - TMSPNo Exposure2/11/200112/31/2001
TNR056377Sherman Dixie Concrete Industry - TMSPInactive11/10/200212/31/2006

Documents at this Site

View
TNG110406Notice of Violation2024 CEI NOV - Failure to retain documentation for pH analysis, repeated exceedances of TSS, failure to report noncompliance, visible scum and solids in stormwater discharge, and failure to properly analyze pH.12/4/2024
TNG110406EmailEmail from DWR approving proposed long-term TSS treatment method improvement8/15/2024
TNG110406ReportSDS for the polymer in question to be used for Long-Term Treatment Method Proposal8/13/2024
TNG110406Memoproposed improvements for the offsite sediment transport received via email; VMJ requested SDS prior to review/evaluation8/6/2024
TNG110406LetterResponse to Notice of Exceedance7/7/2023
TNG110406EmailBenchmark Exceedance Letter Update Request6/28/2023
TNG110406LetterBenchmark Exceedances 4/27/2023
TNG110406Notice of Coverage (NOC)Foley Products Company1/13/2023
TNG110406Old PermitFoley Products Company, LLC - Franklin Plant4/25/2022
TNG110406EmailEmail Confirmation of No Process Water Claim4/13/2022
TNG110406Notice of Intent (NOI)Notice of Intent4/13/2022
TNG110406Letter2022 CEI NOV Response, New SWPPP, No process water claim, More eels4/13/2022
TNG110406Notice of Violation2020 CEI NOV major discrepancy between the NOC and physical site layout, failure to maintain an up-to-date SWPPP, multiple suspended solids violations, and improper pH analysis 2/18/2022
TNG110406Corrective Action Plan2021 Benchmark Exceedance Action Plan 7/15/2021
TNG110406Green Card2021 Benchmark Exceedance Action Plan Received Receipt7/15/2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Complaints on this Site

no data found

Inspections at this Site

Permittee Name
05-NOV-2024TNG110406Foley Products Company, LLCCompliance Eval (non-sampling) (CEI)Out of Compliance
10-FEB-2022TNG110406Foley Products Company, LLCCompliance Eval (non-sampling) (CEI)Out of Compliance
23-SEP-2014TNG110406Foley Products Company, LLCCompliance Eval (non-sampling) (CEI)Minor Deficiency Noted
23-JAN-2007TNR056377Sherman Dixie Concrete IndustryStormwater Non-Construction Non-SamplingIn Compliance