Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
161217New Canada Road MLS Relocation ProjectSouth of Memphis Arlington Road and East of Canada RoadLakelandShelbyMemphis

Permit Information

TNG670720
Hydrostatic
Active
TEXAS GAS TRANSMISSION, LLC
PN 13713 MLS Pipe Replacement Covington-Lakeland Project
Texas Gas proposes to hydrostatically test three sections of natural gas pipeline that will be installed via horizontal directional drill. The new sections range in length and diameter from 1,924 feet to 2,136 feet and from 26 to 30 inches, respectively.
N/A
19-MAR-2024
04-APR-2024
04-APR-2024
01-MAY-2024
30-APR-2026
Scotts Creek, ~0.27 miles east of the discharge point
The hydrostatic test water will be transfered from the pipes into a frac tank. From there, the water will be discharged through a filter bag at a hay bale structure. These BMPs will minimize erosion caused by the discharge.
02-MAY-2024 07:27AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NRS23.143Texas Gas Transmission, LLCMLS Pipe Replacement Covington-Lakeland ProjectARAPActiveN/AMemphis06-MAR-202406-MAR-202405-MAR-2029
NR2105.030Texas Gas Transmission, LLCNew Canada Road MLS Relocation ProjectARAPInactiveN/AMemphis-26-MAY-202107-APR-2025
  • 1 - 2 of 2

Permit Documents

View
Notice of Intent (NOI)RCVD VIA EMAIL 19-MAR-24: Hydrostatic NOI by Cale LeBlanc19-MAR-2024
Notice of Coverage (NOC)Notice of Coverage (NOC) 202404-APR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

no data found