Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5741Water Authority of Dickson County - Fairview STP7223 CCC RoadFairviewWilliamsonNashville

Permit Information

TN0062332
Individual
Reissuance
Water Authority of Dickson County
Fairview STP
Treatment of domestic sewage in oxidation ditch with chlorination, dechlorination and post-aeration
I
M
MW
30-JUN-2021
23-MAY-2016
16-JUL-2021
17-AUG-2021
20-OCT-2021
01-JAN-2022
31-DEC-2026
12-JUL-2022
Flatrock Branch at mile 2.15
treated domestic wastewater from Outfall 001
Concentric oxidation ditches, 2 clarifiers, chlorination, post aeration & dechlorination. WAS to aerobic digester to MH in CS then thru FM to Jones Creek STP
4952
.46
08-JUL-2024 03:49PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNRX50135Wastewater Treatment Facility-TMSPNo ExposureN/ANashville---
TNB062332Water Authority of Dickson County - Fairview STP-BiosolidsInactiveN/ANashville---
  • 1 - 2 of 2

Permit Documents

View
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP - 0.7 MGD K2 =5 no add load by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP 0.46 MGD K2=2.5 SOD = .086 by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP 0.7 MGD K2 = 2 eff = background by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP 0.7 MGD Default K2 eff = background by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP 0.7 MGD Default K2 no add load by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP 0.7 MGD Default K2 no add load by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP 0.46 MGD Default K2 by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP - 0.7 MGD K2 =2 no add load by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP 0.46 MGD Default K2 eff = background by SAQ.20-MAY-2003
ReportREF 20-MAY-03: report re: Flat Rock Branch stream modeling. SP Flatrock Br FWWTP - 0.7 MGD K2 =2.5 no add load SOD = .086 by SAQ.20-MAY-2003
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/ILetterSelf Imposed Moratorium on Connections10/18/2011Closed32
Watch List32

Inspections

30-APR-2017Compliance Biomonitoring (CBI)In Compliance
02-MAR-2007Compliance Biomonitoring (CBI)In Compliance
28-SEP-2012Compliance Eval (non-sampling) (CEI)In Compliance
22-JUN-2006Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
14-DEC-2000Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
09-MAR-2022Compliance Sampling (CSI)Immediately Corrected During Inspection
06-MAY-2009Compliance Sampling (CSI)Minor Deficiency Noted
21-MAY-2005Compliance Sampling (CSI)NOV
29-APR-2008Performance Audit (PAI)NOV
17-MAR-2004Performance Audit (PAI)NOV

Wastewater Engineering Plans Review

24.0469Pending-MJT7/15/2024-Hatcher Heights Subdivision Wastewater Plans
24.0320Pending-MJT7/8/2024-Brush Creek Subdivision
24.0420Incomplete-MJT5/28/2024-City Center
24.0155ApprovedCDMJT2/29/20244/19/2024Orrinshire Subdivision
24.0120ApprovedCDMJT2/19/20244/1/2024Highbury Pointe
24.0073ApprovedCDMJT1/30/20244/1/2024West Way Unit 2
23.0623ApprovedCDMJB12/14/20231/4/2024Cedarcrest Subdivision
23.0756ApprovedCDMJT12/5/20232/12/2024Reserves on Chester
23.0253ApprovedCDMJB5/17/20235/26/2023Bourdon Place (27 homes)
22.0758ApprovedCDA. Bahour3/30/20233/31/2023Adams Preserve Townhomes