Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5538Oneida STP1690 O&W RoadOneidaScottKnoxville

Permit Information

TN0064424
Individual
Reissuance
Town of Oneida
Oneida STP
Treatment of municipal sewage via oxidation ditch followed by chlorination, de-chlorination and cascade-aeration
I
M
MW
22-APR-2024
19-APR-2024
23-APR-2024
30-APR-2024
10-JUN-2024
01-SEP-2024
31-AUG-2029
Pine Creek at mile 7.2
treated municipal wastewater from Outfall 001
Oxidation ditch preceded by screening and grit removal and followed by chlorine disinfecting and cascade aeration. Sludge is dewatered on beds using polymers.
4952
.98
04-DEC-2024 08:55AM

Other DWR permits at this site

Permit Documents

View
Emailnotification regarding minor modification to correct percent removal qualifiers05-JAN-2017
Letterletter requesting response to SSO-inspection-2018 report19-JUL-2018
Letterletter re: need for separate certified operator for collection system13-SEP-2018
Draft Permitdraft permit, proposes silver limit and total nitrogen limit16-DEC-2014
Notice of Violationcomplaint investigation report and NOV re: wet-weather sanitary sewer overflows31-AUG-2018
Report_Industrial Waste Survey03-FEB-2020
LetterWPN23.0784 Approval Letter 2024021212-FEB-2024
ModelWPN18.0360_Biowin model results and narrative descriptions of modifications for biological nutrient removal31-MAY-2018
ApplicationUPDATED 22-APR-24: part 2 of Form 2A w/ yard piping plan, project location maps, and analytical reports added to RCVD VIA EMAIL 25-MAR-24: part 1 of Form 2A by Steve Owens25-MAR-2024
LetterTAV-2022-Combined06-MAY-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetter3/25/2019Active59

Inspections

30-SEP-2024Pretreatment Compliance (oversight)In Compliance
30-SEP-2024Compliance Eval (non-sampling) (CEI)In Compliance
25-OCT-2023Pretreatment AuditOut of Compliance
15-APR-2022Pretreatment TAV and File ReviewIn Compliance
27-JAN-2022Compliance AssistanceIn Compliance
04-APR-2021Pretreatment Compliance (oversight)In Compliance
10-MAR-2020Pretreatment TAV and File ReviewIn Compliance
22-APR-2019Pretreatment Compliance (oversight)In Compliance
20-JUN-2018Pretreatment AuditOut of Compliance
13-APR-2018Sanitary Sewer Overflow Non-SamplingIn Compliance

Wastewater Engineering Plans Review

23.0784ApprovedCDMJT12/13/20232/12/20242022 Sanitary Sewer Rehabilitation
22.0100ApprovedCDShannon Mc2/24/20223/4/2022Oneida 2021 ARC Sanitary Sewer Rehabilitation
21.0041ApprovedCDTNH2/10/20212/24/2021Bear Creek Road Apartments Sewer Line Extension
20.0760ApprovedCDRGO12/17/20201/3/20212020 ARC Sanitary Sewer Rehabilitation
20.0082ApprovedCDA. Bahour3/18/20203/18/2020Oneida Relocation
18.0360ApprovedSTPUPGRWDM5/31/20186/7/20182017 Wastewater Treatment Plant Modifications
16.0419ApprovedSTPUPGRWDM5/31/20166/14/20162015 CDBG WWTP
04.0081ApprovedSTDSPECPhil Simmo1/26/20041/26/2004STD SPECS
24.0214Approved-MJB3/24/267/12/2024Oneida Standard Sewer Specifications