Site IDSiteLocationCityCountyEFO Name
5749Munford Sewer Department Lagoon1397 Munford Ave.MunfordTiptonMemphis

Permit Information

TN0062499
Individual
Modification
City of Munford
Munford Sewer Department Lagoon
Treatment of municipal sewage; Modification adds limits for a proposed expansion of the lagoon from 2 MGD to 3 MGD. The permittee has asserted that the receiving stream has more than sufficient assimilative capacity for the increased loading; The upgrade may warrant replacement of the outfall line
M
M
MW
01-APR-2024
25-MAR-2024
17-MAY-2024
02-JUL-2024
02-DEC-2020
01-JAN-2021
31-DEC-2025
Mississippi River Mile 761
treated municipal wastewater from Outfall 001 from a lagoon with chlorine disinfecting serving Munford and the Towns of Atoka and Brighton
lagoon system (exempt from 503)
4952
2
25-JUN-2024 10:25AM

Other DWR permits at this site

Permit Documents

View
LetterNotice of Complete Application with Sign Posting Requirements01-JUL-2024
ApplicationApplication with Construction Date Clarifications28-MAR-2024
LetterNotice of Incomplete Application25-MAR-2024
LetterWPN 18.0094R Extension Letter 03.05.202405-MAR-2024
ApplicationRCVD VIA EMAIL 27-FEB-24: Form 2A by Dwayne Cole27-FEB-2024
LetterWPN23.0493 ARP Memo 2023121111-DEC-2023
LetterWPN23.0449 Approval Letter 2023112121-NOV-2023
Letter18.0094R Approval letter 2023062020-JUN-2023
ReportPAI 202228-OCT-2022
ReportSanitary Sewer System CEI07-OCT-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

24-OCT-2022Performance Audit (PAI)In Compliance
03-OCT-2022Sanitary Sewer SystemIn Compliance
13-NOV-2020Compliance Eval (non-sampling) (CEI)In Compliance
23-MAY-2019Compliance Eval (non-sampling) (CEI)In Compliance
01-FEB-2017Compliance Eval (non-sampling) (CEI)In Compliance
01-FEB-2017Sanitary Sewer Overflow Non-SamplingIn Compliance
11-MAR-2015Compliance Eval (non-sampling) (CEI)In Compliance
06-FEB-2013Compliance Eval (non-sampling) (CEI)In Compliance
08-MAR-2011Compliance Eval (non-sampling) (CEI)In Compliance
27-APR-2009Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

23.0449ApprovedCDTNH10/25/202311/21/2023Bell Park Subdivision
22.0328ApprovedCDA. Bahour8/22/20228/31/2022Villages of Green Meadows Subdivision 4A
22.0083Review CompleteCDTNH2/28/2022-SRF Giltedge Road
21.0695Review CompleteCDTNH9/27/202110/8/2021SRF Munford Lagoon Influent Pump Upgrade
21.0647ApprovedCDMNU11/9/202111/9/2021Walker Meadows North
21.0382ApprovedCDMNU5/12/20216/7/2021Glenview Estates Section D
19.0562ApprovedCDA. Bahour11/8/201911/18/2019Walker Meadows Subdivision - Phase 2
18.0094RApprovedCDMJB6/9/20236/20/2023Villages of Green Meadows Phase 3
18.0294ApprovedFMMNU5/3/20185/30/2018Quality Tire Subdivision
13.0219ApprovedFMJMS5/2/20136/7/2013Village of Green Meadows P.D.