Permit Information

TN0024996
Individual
Modification
City of Crossville
Crossville STP
Permit modification as a response to draft permit comments Treatment of municipal sewage
M
M
MW
05-JAN-2022
05-JAN-2022
22-FEB-2022
14-FEB-2022
01-MAR-2022
31-DEC-2026
22-MAR-2022
Obed River at mile 38.6
treated municipal wastewater from Outfall 001
WAS to aerobic dig to lime stab to land application
4952
3.5
23-DEC-2024 09:40AM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR171486City of CrossvilleCity of Crossville WWTP ImprovementsCGPInactiveN/ACookeville-03-FEB-2010-
TNR056409City of Crossville Wastewater Treatment Plant-TMSPNo ExposureN/ACookeville26-MAR-200316-MAR-200331-DEC-2006
TNB024996Crossville STP-BiosolidsExceptional QualityN/ACookeville---
  • 1 - 3 of 3

Permit Documents

View
Letter24.0654 Approval letter 2024093030-SEP-2024
Letter24.0655 Approval letter 2024093030-SEP-2024
LetterWPN24.0701 Approval Letter 2024093030-SEP-2024
ReportTechnical Assist Visit Letter14-AUG-2024
LetterWPN24.0575 Approval Letter 2024081414-AUG-2024
Inspection ReportCEI 2024 Letter17-JUL-2024
LetterWPN24.0409 Approval Letter 2024062828-JUN-2024
MemoWPN24.023 ARP Memo 2024041818-APR-2024
MemoWPN24.0146 ARP Memo 2024031919-MAR-2024
LetterWPN23.0811 Approval Letter 2024022020-FEB-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

18-JUL-2024Pretreatment TAV and File ReviewIn Compliance
28-JUN-2024Compliance Eval (non-sampling) (CEI)In Compliance
26-MAY-2023Pretreatment Compliance (oversight)In Compliance
14-JUL-2022Pretreatment AuditIn Compliance
18-JAN-2022Compliance Eval (non-sampling) (CEI)In Compliance
15-DEC-2020Pretreatment TAV and File ReviewIn Compliance
17-JUL-2020Compliance Biomonitoring (CBI)In Compliance
17-MAR-2020Pretreatment Compliance (oversight)In Compliance
25-APR-2019Pretreatment TAV and File ReviewIn Compliance
17-APR-2019Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0655ApprovedCDMJB9/30/202410/1/2024Sewer Plan for Canary Drive - Crossville, TN
24.0654ApprovedCDMJB9/30/202410/1/2024Marlow Farm Utility Extension - Sewer
24.0701ApprovedCDTNH9/9/20249/30/2024Peavine Road Force Main
24.0575ApprovedCDTNH8/13/20248/14/2024Hwy 127 & Genesis Road I-40 Crossings
24.0409ApprovedCDTNH5/23/20246/28/2024LOPS Improvements, Justice Center Course Bar Screen, and Tansi ES District 5 Grinder PS
24.0223Review CompletePERTNH3/28/20244/18/2024PER Sewer System Evaluation for Area North of I-40
24.0146Review CompletePERTNH2/26/20243/19/2024Preliminary Engineering Report for Crossville, TN
23.0811ApprovedCDMJT12/27/20232/20/2024BRIDGE OVER OBED RIVER, LM 12.72 SEWER LINE RELOCATION 18002-3233-94 (CUMBERLAND COUNTY) BR-NH-1(386); PIN 124052.00
23.0808ApprovedCDMJT12/22/20231/19/2024Genesis Road Sewer Line Extension
23.0550RApprovedCDMJT11/20/20231/8/2024PROPOSED ACCESS ROAD-XI PROPERTIES