Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5945Gordonsville STP101 Blair RoadSouth CarthageSmithCookeville

Permit Information

TN0067733
Individual
Reissuance
Town of Gordonsville
Gordonsville STP
treatment of domestic wastewater by activated sludge process
I
M
MW
28-SEP-2023
27-SEP-2023
28-SEP-2023
27-DEC-2023
30-JAN-2024
01-JUN-2024
31-MAY-2029
Cumberland River (Old Hickory Reservoir) at mile 308.3
treated municipal wastewater from Outfall 001
Activated sludge
4952
.325
30-JAN-2024 09:19AM

Other DWR permits at this site

Permit Documents

View
FormPT IWS15-MAR-2024
PermitFinal permit; Issue 1/30/2430-JAN-2024
Draft PermitDraft permit; PN 12/27/2327-DEC-2023
LetterRCVD VIA EMAIL 02-OCT-23: letter re: sig auth for Stevie Gentry by John Potts02-OCT-2023
ApplicationRCVD VIA EMAIL 12-SEP-23: NPDES app by John Potts with clarifications received of Michael Ray on 28-SEP-23.28-SEP-2023
Letter22.0257 Extension Letter27-JUL-2023
Letter22.0256 App Letter03-AUG-2022
Letter22.0257 App Letter07-JUL-2022
LetterNotification of change in Director of Operations10-JUN-2022
Letter22.0257 Owner Letter26-MAY-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

24-MAR-2022Compliance Eval (non-sampling) (CEI)In Compliance
31-MAR-2021Sanitary Sewer SystemIn Compliance
18-MAR-2018Compliance Biomonitoring (CBI)In Compliance
24-MAR-2014Compliance Eval (non-sampling) (CEI)In Compliance
31-JAN-2013Compliance Eval (non-sampling) (CEI)In Compliance
14-DEC-2011Compliance Sampling (CSI)Minor Deficiency Noted
08-JUN-2011Compliance Sampling (CSI)In Compliance
27-APR-2011Compliance Eval (non-sampling) (CEI)In Compliance
27-JUL-2010Reconnaissance (RI)Complete and Stable
28-MAY-2010Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

22.0257ApprovedCDMNU7/7/20227/7/2022Gordonsville Force Main Improvement Project
22.0256ApprovedCDMNU8/3/20228/3/2022Bon L Acres
21.0734RApprovedCDMJB4/25/20224/25/2022Cedar Stone Subdivision Revised
21.0734ApprovedCDMJB10/8/202111/1/2021Cedar Stone Subdivision
19.0759ApprovedCDMNU12/2/201912/26/2019Gordonsville Sewer System Phase 5
19.0470ApprovedCDA. Bahour9/5/20199/5/2019Eatherly Landholdings
13.0609ApprovedIMPA. Bahour9/30/201310/18/2013Highway 53 Lift Station Modifications
18.0257ApprovedLINEMNU4/23/20185/15/2018Proposed Collection System Expansion Phase IV
24.0397PendingPERTNH5/20/2024-Highway 53 Pump Station Rehabilitation Preliminary Engineering Report
16.0156ApprovedotherJim McAdoo2/29/20163/7/2016SRF Contract 1