SOP-97019
SOP
Reissuance
City of Ridgetop
STEP collection system from Goodlettsville to Nashville Dry Creek STP
N/A
M
CS
12-DEC-2022
04-JAN-2023
23-MAY-2023
26-JUN-2023
01-SEP-2023
31-AUG-2028
N/A
No discharge allowed
STEP sewage collection system to the Goodlettsville sewage collection system to Nashville Dry Creek STP
.01
26-JUN-2023 08:35PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
ApplicationRCVD VIA EMAIL 12-DEC-22: SOP app by Tim Shaw12-DEC-2022
ApplicationSOP-97019 Application Received May-8-201808-MAY-2018
ApplicationRCVD VIA EMAIL 12-JUL-13: SOP app by Darrell Denton.12-JUL-2013
ApplicationRCVD VIA EMAIL 03-MAY-13: SOP app by James Hudgins.03-MAY-2013
Draft PermitDraft SOP Permit23-MAY-2023
Draft PermitSOP-97019_Collection_System_Draft_Permit 201822-MAY-2018
Emailread receipt from MAyor re NOV15-JUN-2022
EmailMyTDEC Forms Req Notification - Event Form04-NOV-2021
EmailUpdate from consulting engineer about chronic overflow point31-OCT-2019
EmailResignation of operator in charge05-SEP-2019
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterMoratorium based on chronic overflows at the end of the system, I/I issues. Closed effective March 26, 2020. Authorized through Engineering section. Overflows corrected.6/27/2019Closed

Inspections

15-FEB-2019Compliance Evaluations (non-NPDES)Out of Compliance
12-NOV-2013Compliance Evaluations (non-NPDES)NOV
18-AUG-2011Compliance Evaluations (non-NPDES)NOV
20-DEC-2007Compliance Evaluations (non-NPDES)NOV

Wastewater Engineering Plans Review

24.0276Review CompletePERTNH4/12/20244/15/2024Ridgetop ARP Rehabilitation
24.0180ApprovedCDTNH3/8/20244/15/2024I&I Reduction / Sewer Rehabilitation
22.0405ApprovedCDMJB7/14/20227/22/2022Lake Road Sewer Extension
21.0254ApprovedCDTNH3/24/20214/9/2021Highland Ave Sewer Extension
21.0088ApprovedCDMNU3/4/20213/9/2021Browning Estates
20.0569ApprovedCDMJB9/17/20209/18/2020Barwood Drive Sewer Extension
20.0363ApprovedCDMJB7/16/20207/16/2020Woodruff Ave Sewer Extension
15.0303ApprovedLPCSA. Bahour6/22/20156/26/2015Ridgetop Station S/D, Phase 2
15.0224ApprovedLPCSA. Bahour5/15/20155/19/2015Barwood LPS Expansion
06.0933ApprovedSTDSPECMBS7/25/20068/16/2006Standard Specifications