Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5188Watertown STP106 S Commerce RdWatertownWilsonNashville

Permit Information

TN0025488
Individual
Reissuance
City of Watertown
Watertown STP
Treatment of domestic sewage via extended aeration activated sludge and ultraviolet light disinfecting
I
M
MW
22-FEB-2024
12-SEP-2013
04-MAR-2024
21-MAY-2024
24-JUL-2024
01-SEP-2024
31-JUL-2029
18-OCT-2021
Round Lick at mile 20.0
treated domestic wastewater from Outfall 001
Extended aeration with ultraviolet disinfection
4952
.27
05-NOV-2024 04:05PM

Other DWR permits at this site

Permit Documents

View
ReportREF 11-JUL-86: report re: waste load allocation by Susan Primm.11-JUL-1986
ReportREF 16-APR-91: report re: recommended limits by Mark Browning.16-APR-1991
ReportREF 24-JUN-93: report re: assessment of Round Lick Creek by D.L. Gillis.24-JUN-1993
ReportREF 15.APR-96: report re: activated sludge by Marvin Smith.15-APR-1996
ReportREF 15-AUG-05: report re: annual sludge by Janet Hensley.15-AUG-2005
ReportREF 11-MAY-06: report re: treatment overview by Marvin Smith.11-MAY-2006
EmailREF 07-JUL-06: email re: operator certification by Phil Simmons.07-JUL-2006
EmailREF 24-JUN-09: email string re: including cyanide by Souraya Fathi.24-JUN-2009
MemoREF 17-NOV-09: memo re: document review by Wade Murphy.17-NOV-2009
LetterComments on Draft permit from: Policy and Legislative Affairs/ Tennessee Clean Water Network09-DEC-2009
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsPermitChronic overflows reported via the CMOM triggering a SIM per the permit language in Section 2.3.3. Applicable to Basin 1 8/31/2021Active61

Inspections

25-OCT-2023Pretreatment AuditIn Compliance
25-OCT-2022Pretreatment TAV and File ReviewIn Compliance
18-NOV-2021Pretreatment Compliance (oversight)In Compliance
05-NOV-2019Pretreatment Compliance (oversight)In Compliance
27-NOV-2018Pretreatment AuditIn Compliance
20-MAR-2018Pretreatment TAV and File ReviewIn Compliance
20-NOV-2012Pretreatment TAV and File ReviewIn Compliance
15-SEP-2011Compliance Sampling (CSI)In Compliance
06-JUN-2007Pretreatment TAV and File ReviewIn Compliance
15-DEC-2011Pretreatment Compliance (oversight)Minor Deficiency Noted

Wastewater Engineering Plans Review

20.0453Review CompleteCDRGO7/22/20208/4/2020SRF Watertown Rehabilitation
22.0698ApprovedCDA. Bahour8/28/20238/30/2023West Woodland Ave. / New Town Rd. Subdivision
23.0576ApprovedCDMJT10/5/202311/21/2023Watertown Sewer Rehabilitation
24.0665ApprovedCDRGO8/24/249/5/2024OVERLOOK VALLEY- SEWER EXTENSION
23.0482Review CompleteCMOMRGO8/31/2023-Watertown Annual CMOM 2023
21.0675Review CompleteC&E ReviewAEWF8/27/2021-CMOM annual report
20.0654Review CompleteCMOMAEWF10/29/2020-Watertown CMOM 2020 Update
19.0732Review CompleteCMOMAEWF11/8/2019-CMOM annual report
19.0356InactiveCDA. Bahour7/9/2019-Jerry Stroud and Bobby Smith