Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
11847APAC Atlantic, Inc. Harrison Division / Knoxville Concrete1730 Transport LaneKnoxvilleKnoxKnoxville

Permit Information

TNG110289
RMCP
Active
Harrison Construction Company
APAC Atlantic Inc. Harrison Division/Knoxville Concrete
Ready Mix Concrete Plant
N/A
PW, SW
23-AUG-2023
31-JAN-2023
07-SEP-2023
07-SEP-2023
01-OCT-2023
31-OCT-2027
Woods Creek to Holston River from Outfalls 001/SW1
process wastewater from Outfall 001 and stormwater runoff from Outfall SW1
All process water is contained in a large concrete retention basin. Storm water is processed through a series of three retention ponds offsite.
3273
24-MAY-2024 03:14PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Inspection ReportInspection report 7-30-2430-JUL-2024
Inspection ReportInspection Report17-JUN-2024
LetterResponse to NOV dated 23-FEB-2421-MAR-2024
Notice of ViolationNOV for failure to submit 2023 annual stormwater DMR23-FEB-2024
Notice of Coverage (NOC)Notice of Coverage (NOC) 202307-SEP-2023
Inspection ReportCompliance Evaluation Inspection29-APR-2022
Inspection ReportCompliance Evaluation Inspection 09-JAN-2018
Notice of Coverage (NOC)2017 NOC 22-NOV-2017
Notice of Intent (NOI)RCVD 21-NOV-17: RMCP NOI by Tyler Rutherford.21-NOV-2017
LetterLetter- EH&S responsible party29-APR-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

23-MAR-2009SpillNOV
24-MAR-2009Compliance Eval (non-sampling) (CEI)NOV
25-MAR-2009Follow-upNOV
22-JUN-2011Stormwater Non-Construction Non-SamplingFollow-up Inspection Required
29-OCT-2013Compliance Eval (non-sampling) (CEI)In Compliance
09-JAN-2018Compliance Eval (non-sampling) (CEI)In Compliance
29-APR-2022Compliance Eval (non-sampling) (CEI)In Compliance
17-JUN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
30-JUL-2024Follow-upIn Compliance