Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5255City of Lebanon Gasification Plant dba Lebanon Waste Water Treatment Plant321 Hartmann DriveLebanonWilsonNashville

Permit Information

TN0028754
Individual
Reissuance
City of Lebanon
Lebanon POTW
Treatment of municipal sewage by conventional activated sludge preceded by flow equalization, mechanical screening and grit removal and followed by ultraviolet disinfection.
M
M
MW, RU
19-DEC-2023
16-JAN-2024
16-APR-2024
24-JUN-2024
01-AUG-2024
31-MAY-2029
Cumberland River (Old Hickory Reservoir) at mile 252.2
treated municipal wastewater from Outfall 001
4952
10
08-NOV-2024 08:45AM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR146287City of Lebanon, Dept. of Public Works-CGPInactiveN/ANashville-22-APR-2008-
NR1804.078City of Lebanon, Dept. of Public WorksBlaire Lane Sewer UpsizeARAPInactiveN/ANashville-10-MAY-201806-APR-2020
TNB028754Lebanon STP-BiosolidsActiveN/ANashville15-APR-202015-APR-202015-AUG-2024
  • 1 - 3 of 3

Permit Documents

View
EmailPT Narrative Conditions Reminder IWS TELL30-SEP-2024
Letter24.0660 Approval letter 2024092424-SEP-2024
Letter24.0698 Plans Approval LTR 2024092323-SEP-2024
LetterWPN24.0445 Approval Letter 2024091619-SEP-2024
EmailResponse to request to not sample quarry water. Request granted.16-SEP-2024
EmailNOV communication, removed requirement to sample due to other substances dumped in quarry16-SEP-2024
Notice of Violation2024 NOV for incident investigation incorrect disposal of sludge to a water of the state, Samples must be collected04-SEP-2024
Letter24.0591 Plans Approval LTR 2024082323-AUG-2024
LetterWPN23.0749R Approval Letter 202481519-AUG-2024
LetterWPN24.0447 Approval Letter 2024040708-AUG-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/ILetterSelf Imposed Moratorium, Spoke with Regina Santana at the city. The facility has been allowed to add to collection system at a rate based on the reduction in flow as a result of rehabilitation work. The main plant was also expanded. - JAH 3/4/2016 The facility submitted in May 2016 the 2015 status report which stated that they did not have five overflows in the same location since 2011. The order was closed officially on 15-SEP-16. The city is not on a moratorium. JAH 9/22/2016 9/22/2016Watch List66

Inspections

30-JUN-2024Compliance AssistanceIn Compliance
09-FEB-2024Performance Audit (PAI)In Compliance
09-FEB-2024Compliance Biomonitoring (CBI)In Compliance
29-MAR-2023Pretreatment Compliance (oversight)In Compliance
07-MAR-2022Pretreatment AuditOut of Compliance
25-JAN-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
30-JAN-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JAN-2020Pretreatment Compliance (oversight)Out of Compliance
29-MAR-2019Pretreatment TAV and File ReviewIn Compliance
01-DEC-2017Sanitary Sewer Overflow Non-SamplingIn Compliance

Wastewater Engineering Plans Review

24.0660ApprovedCDMJB8/24/239/24/2024Barton Village - Phase 1A
24.0698ApprovedCDRGO9/24/69/23/2024Jones Bros Asphalt Plant
24.0445ApprovedCDMJT6/5/20249/16/2024North College Street Alley Utility Replacements
24.0591ApprovedCDRGO7/24/308/23/2024Rockdale VIII
23.0749RApprovedCDMJT7/9/20248/15/2024Hamilton Springs Retail Center: REVISED PLANS
24.0527ApprovedCDMJB7/10/20248/12/2024Woodbridge Glen Phases 3-4
24.0447ApprovedCDMJT6/6/20248/7/2024Summercrest Sewage Pump Station Replacement
24.0457ApprovedCDMJT6/11/20248/6/2024Barton Village Phase 3
24.0487ApprovedCDMJB6/24/217/30/2024HWY 109 Warehouses
24.0343ApprovedCDMJB5/24/67/25/2024Farmington Woods Pump Station Abandonment