Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5146Lexington Utilities- Waste Water Treatment Plant677 South Main Street; mail to 54 Monroe Ave.LexingtonHendersonJackson

Permit Information

TN0024341
Individual
Reissuance
City of Lexington, Utilities Division
Lexington Utilities STP
Treatment of municipal sewage by activated sludge treatment and PAA disinfection
M
M
MW
01-MAR-2023
27-MAR-2023
26-SEP-2023
30-OCT-2023
01-NOV-2023
31-OCT-2028
Beech River at mile 29.7
treated municipal wastewater from Outfall 001
Activated sludge treatment preceded by screening and flow equalization with PAA disinfection, post aeration and foam control
4952
3.2
05-DEC-2024 11:50AM

Other DWR permits at this site

  • 1 - 2 of 2
  • 1 - 2 of 2

Permit Documents

View
Report APR 2018 PT SAR 27-APR-2018
Report revised Oct 2019 PT SAR30-OCT-2019
Letter16-0624 Cover Letter03-AUG-2016
Engineering Calculations16-0624 Lexington Pump Station Improv03-AUG-2016
Letter16-0624 Lexington Pump Station Improvements19-AUG-2016
Engineering Calculations17.0508 East Lagoon Pump Station Mod Calcs31-JUL-2017
Letter17.0508 Lexington Influent Pump Station Approval Letter14-AUG-2017
Memo17.0508 Lexington influent pump station upgrades review memo14-AUG-2017
Letter18-0209 Letter04-JUN-2018
Letter18-0209 Ref30-MAY-2018
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

04-APR-2024Pretreatment TAV and File ReviewIn Compliance
13-FEB-2024Compliance Eval (non-sampling) (CEI)In Compliance
25-JUL-2023Pretreatment Compliance (oversight)In Compliance
29-JUN-2022Pretreatment AuditIn Compliance
23-FEB-2022Compliance Eval (non-sampling) (CEI)In Compliance
11-FEB-2022Sanitary Sewer SystemIn Compliance
17-AUG-2021Pretreatment TAV and File ReviewIn Compliance
23-JUN-2020Pretreatment Compliance (oversight)In Compliance
16-JAN-2020Sanitary Sewer SystemIn Compliance
15-JAN-2020Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0234PendingCDTNH4/2/20247/17/2024West Main Pump Station Modifications
23.0425PendingCDTNH8/8/20239/8/2023Beech River Pump Stations and Force Main
23.0014PendingCDMNU1/6/20231/24/2023Thomas Meadows S/D
22.0031ApprovedCDMNU3/28/20223/28/2022WTP Process Wastewater Pump Station, Force Main and Gravity Sewer
20.0583ApprovedCDZachSeiden7/1/20217/1/2021Town Branch Interceptor Sewer Replacement
21.0462ApprovedCDMNU6/14/20217/9/2021Lift Station #33
21.0195ApprovedCDMJB3/9/20214/5/2021North Industrial Park Sewer Facilities Phase 2
21.0113ApprovedCDTNH3/1/20213/2/2021Lift Station #9 Removal & Skyline Drive
21.0114Approved-ZachSeiden2/8/20213/26/2021Industrial Park Gravity Sewer Extension
20.0640ApprovedCDMJB10/21/202011/18/2020Lift Station #25 Relocation