Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5045Dyer STP199 Becton DriveDyerGibsonJackson

Permit Information

TN0021563
Individual
Reissuance
City of Dyer
Dyer STP
Treatment of municipal sewage by extended aeration activated sludge (oxidation ditch) and chlorine disinfection
I
M
MW
01-FEB-2022
16-FEB-2022
19-APR-2022
20-MAY-2022
01-AUG-2022
31-JUL-2027
Sand Creek at mile 1.6
treated municipal wastewater from Outfall 001
Extended aeration activated sludge (oxidation ditch), chlorine disinfecting. Sludge is dried on beds.
4952
.675
08-JUL-2024 03:49PM

Other DWR permits at this site

Permit Documents

View
ApplicationRenewal Application01-FEB-2022
ApplicationRCVD VIA EMAIL 17-MAR-17: NPDES app by Nathan Reed.17-MAR-2017
ApplicationRCVD VIA EMAIL 01-MAR-17: NPDES app by Chris Younger.01-MAR-2017
Draft PermitDraft Permit19-APR-2022
Draft PermitDraft Permit14-JUN-2017
EmailDyer COIDC 202328-JUL-2023
EmailMyTDEC Forms Req Notification - Event Form10-MAR-2021
FormDyer CEI 356024-SEP-2012
Inspection ReportDyer STP CEI 202416-MAY-2024
Inspection ReportDyer 04-MAR-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetter607 North Main Street and the Becton Street lift station running parallel to Sand Creek has reported 15 overflows to our MyTDEC system since 9/1/2023-- the permit conditions requiring a self-imposed moratorium have been met.2/13/2024Active72
I/I4 overflows between July 2011 and January 2013. Removed from moratorium list by PMS on 4/3/13.4/3/2013Closed72

Inspections

15-AUG-2007Reconnaissance (RI)Complete and Stable
30-SEP-2009Pretreatment TAV and File ReviewFollow-up Inspection Required
17-OCT-2008Compliance Eval (non-sampling) (CEI)Follow-up Inspection Required
09-MAY-2024Compliance Eval (non-sampling) (CEI)In Compliance
23-JUL-2019Compliance Eval (non-sampling) (CEI)In Compliance
23-AUG-2018Follow-upIn Compliance
13-SEP-2017Compliance Eval (non-sampling) (CEI)In Compliance
29-AUG-2017Compliance Eval (non-sampling) (CEI)In Compliance
26-FEB-2015Compliance Eval (non-sampling) (CEI)In Compliance
22-AUG-2014Reconnaissance (RI)In Compliance

Wastewater Engineering Plans Review

13.0288Review CompletePERJMS5/29/20137/3/20132013 CDBG - Dyer Sewer System Improvements
14.0165ApprovedIMPA. Bahour3/19/20144/28/20142013 CDBG for Sanitary Sewer Improvements
23.0620ApprovedCDA. Bahour10/30/202311/29/2023City of Dyer Sewer Line Replacement
24.0094Review CompletePERTNH2/7/20242/26/2024City of Dyer I&I Reduction Plan
24.0415Review CompletePERTNH5/27/20246/18/20242022-8879 City of Dyer ARP Preliminary Engineering Report
24.0558ApprovedCDTNH7/24/217/31/2024City of Dyer - 2022-8879 - WW-PDC-2 - Wastewater Collection System - Investigation & Lining