5043Alexandria STP35 Edgewood RoadAlexandriaDeKalbCookevilleView Map

Permit Information

TN0021539
Individual
Reissuance
Town of Alexandria
Alexandria STP
Treatment of municipal sewage via sequencing batch reactor with post treatment flow equalization and ultraviolet light disinfecting
I
M
MW
11-MAY-2022
25-JAN-2012
21-MAY-2022
28-JUN-2022
29-JUL-2022
01-AUG-2022
31-JUL-2027
Hickman Creek at mile 13.1
treated municipal wastewater from Outfall 001
Sequencing batch reactor (SBR) with post equalization and UV disinfection. Sludge is aerobically digested and dewatered for landfilling.
4952
.3
08-JUL-2024 03:41PM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
ReportREF 28-JUN-82: report re: stream assessment by Hari Akunuri.28-JUN-1982
ReportREF 22-JAN-85: report re: wasteload allocation analysis by TDEC.22-JAN-1985
ReportREF 01-MAY-90: report re: Hickman Creek by Mark Browning.01-MAY-1990
ReportREF 19-APR-95: report re: stream assessment by Sherry Wang.19-APR-1995
ReportREF 03-JUN-96: report re: assessment of Hickman Creek by A.M. Goodhue.03-JUN-1996
ReportREF 14-JAN-00: report re: anti-deg & watershed evaluation by J.R. Smith.14-JAN-2000
MemoREF 09-MAY-00: memo re: operator certification grades by Maybelle Thomas.09-MAY-2000
MemoREF 23-MAY-00: memo re: operator certification grade by Roger Lemasters.23-MAY-2000
MemoREF 26-SEP-02: memo re: operator certification grades by Roger Lemasters.26-SEP-2002
Public Notice DocumentREF 14-MAY-12: public notice by TDEC.14-MAY-2012
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

12-JUL-2024Compliance AssistanceOut of Compliance
30-MAR-2023Compliance Eval (non-sampling) (CEI)Out of Compliance
18-DEC-2019Compliance Eval (non-sampling) (CEI)In Compliance
08-JUL-2019Compliance AssistanceIn Compliance
19-JUN-2018Compliance Eval (non-sampling) (CEI)In Compliance
30-SEP-2016Compliance Eval (non-sampling) (CEI)In Compliance
21-JUN-2013Compliance Eval (non-sampling) (CEI)In Compliance
26-MAR-2012Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
08-JUN-2011Compliance Sampling (CSI)Minor Deficiency Noted
05-MAY-2010Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted

Wastewater Engineering Plans Review

24.0504ApprovedCDTNH6/24/287/22/2024East High Street Sewer Lift Station Replacement
08.0671ApprovedIMPJMS7/1/20088/4/2008Contract B - Sewer System Repair (CDBG)
15.0388Approved-MNU6/19/20157/31/2015Proposed East Main Street Sewer Force Main
21.0213ApprovedCDA. Bahour3/17/20214/15/2021Sewer Line Relocation for SR-26 Highway Project
22.0352Review CompletePPDTNH5/24/2022-Alexandria WWTP Improvements
22.0291Review CompletePERTNH5/31/2022-SRF Alexandria Facilities Plan
23.0411Pending-TNH8/29/2024-SRF 2021-456: Town of Alexandria WWTP Improvements