5168Springfield Water and Wastewater Department - Wastewater Treatment Plant530 Lawrence LaneSpringfieldRobertsonNashville

Permit Information

TN0024961
Individual
Pending
When initially received, all applications are identified as "Pending." Pending status indicates that the application is in the que to be processed or that TDEC-DWR staff are reviewing the application (or Notice of Intent for general permits). Status "Pending" could be also interpreted as "work in progress."
City of Springfield
Springfield STP
Treatment of municipal sewage; Modification proposes to replace the 38 year-old, 3.44 MGD, extended aeration activated sludge and chlorine disinfecting processes with a 7.0 MGD, 4-basin, sequencing batch reactor process, effluent equalization, disc filtration and ultraviolet light disinfecting to maintain existing loadings of oxygen-demanding pollutants and realize higher levels of nutrient removal. Incidental degradation that may still result in spite of the higher level of treatment will not result in pollution and is justified to support area-wide residential and industrial growth.
M
M
MW
21-JUN-2024
20-DEC-2023
06-FEB-2024
06-JUL-2020
01-AUG-2020
31-DEC-2024
Sulphur Fork Creek at mile 23.2 (current 3.44 MGD POTW); Confluence of Carr Creek at mile 0 and Sulphur Fork Creek at mile 23.0 (future 7.0 MGD POTW)
treated municipal wastewater from Outfall 001 (both the existing and new outfall replacing it)
Extended aeration activated sludge preceded by screening and grit removal and followed by ultraviolet disinfecting and oxygenation. Sludge is digested for either belt press dewatering or land application.
4952
3.4
27-JUN-2024 11:55AM

Other DWR permits at this site

  • 1 - 4 of 4
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR2304.044City of SpringfieldCity of Springfield WWTPARAPActiveN/ANashville-02-MAR-202307-APR-2025
TNB024961Springfield STP-BiosolidsActiveN/ANashville06-MAR-201806-MAR-201830-APR-2019
TNR056426Springfield Wastewater Treatment Plant-TMSPActiveN/ANashville19-JUL-202020-JUL-202030-JUN-2025
NRS14.299Springfield Water and Wastewater DepartmentBeans Cave Sewer Repair at Unnamed Tributary to Sulphur Fork CreekARAPInactiveN/ANashville--30-JUN-2015
  • 1 - 4 of 4

Permit Documents

View
Inspection Report2023-2024 CEI - In compliance01-JUL-2024
LetterClarifier Malfunction due to sheared pin on the arm. Near daily max with TSS but no effulent violations as of 1018 hours.26-JUN-2024
ApplicationRCVD VIA EMAIL 21-JUN-24: Form 2A, maps, and flow schematic by Terry Beers21-JUN-2024
LetterWPN24.0381 Approval Letter 2024061212-JUN-2024
LetterWPN 24.0209 Approval Letter17-MAY-2024
EmailNotice of UV system offline due to May 8-9 storm flooding.09-MAY-2024
LetterWPN 20.0502 Extension Letter 04.22.202422-APR-2024
Bio-monitoringWET test results for 30-JAN-24 to 6-FEB-2422-MAR-2024
PermitModified Permit with Addendum at Permit Issue with Limits for 7.0 MGD15-MAR-2024
LetterRCVD VIA EMAIL 26-FEB-24: letter re: comments on Draft by Terry Beers26-FEB-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

29-MAY-2024Compliance Eval (non-sampling) (CEI)In Compliance
21-JUN-2023Pretreatment AuditIn Compliance
14-FEB-2022Compliance Biomonitoring (CBI)In Compliance
25-AUG-2021Pretreatment Compliance (oversight)In Compliance
20-AUG-2020Compliance Eval (non-sampling) (CEI)In Compliance
18-SEP-2019Pretreatment Compliance (oversight)In Compliance
02-AUG-2018Pretreatment AuditOut of Compliance
12-JUN-2018Compliance Sampling (CSI)Out of Compliance
30-AUG-2017Pretreatment TAV and File ReviewIn Compliance
19-SEP-2016Pretreatment Compliance (oversight)Out of Compliance

Wastewater Engineering Plans Review

24.0381ApprovedCDTNH5/16/20246/12/2024Highland Estates
24.0209ApprovedCDJKM4/23/20245/17/2024Jasper Fields Subdivision
23.0645Review CompleteCDTNH11/3/2023-New Wastewater Treatment Plant, Springfield Tennessee
23.0610ApprovedCDMJB11/15/202312/8/2023Low Pressure Sewer Design of Dorris Street Residential
23.0300ApprovedCDTNH7/10/20237/31/20232021 CDBG Sewer System Improvements: CDBG Contract 14979
23.0142ApprovedCDA. Bahour4/25/20234/25/2023Memorial Mansions Townhomes
23.0137ApprovedCDTNH4/19/20235/8/2023Lahr Road Residential Condos
22.0654ApprovedCDA. Bahour11/17/202211/17/202222nd Ave Townhomes
22.0568ApprovedCDA. Bahour10/4/202210/5/2022901 & 903 South Main Condos
22.0478ApprovedCDMNU7/27/20228/3/2022Flats at Moreland