Site IDSiteLocationCityCountyEFO Name
5671Byrdstown STP1099 Spring RoadByrdstownPickettCookeville

Permit Information

TN0062626
Individual
Reissuance
Town of Byrdstown
Byrdstown STP
treatment of municipal sewage by sequenching batch reactor, followed by flow equalization, ultraviolet disinfecting, and step aeration
I
M
MW
07-DEC-2023
28-DEC-2018
27-DEC-2023
06-MAR-2024
08-APR-2024
01-JUL-2024
30-JUN-2029
unnamed tributary at mile 0.25 to Town Creek at mile 0.1
treated municipal wastewater from Outfall 001
increased design capacity; sequenching batch reactor biolgical process preceeded by screening and followed by flow equalization, ultraviolet disinfecting, and step aeration. Residual solids are digested and land applied.
4952
.6
08-JUL-2024 03:41PM

Other DWR permits at this site

Permit Documents

View
Model1988-1998 Models and Planning Limits02-JAN-1998
ModelByrdstown POTW Schematic22-JAN-2004
ImagePhoto Log for Byrdstown STP CEI May 29 201307-JUN-2013
Letter2015 Operator Form25-AUG-2015
Inspection ReportDWRNPDES-TN0062626-CEI 021916-03031604-MAR-2016
EmailNetDMR Final Approval23-MAR-2016
Form2016 Certified Operator Form10-AUG-2016
Letter7/12/16 Bypass report received 10/18/1618-OCT-2016
Inspection ReportDWR-TN0062626-CEI Reports and Letter-08-AUG-2017-RDA_236608-AUG-2017
Environmental Review17.0583 Information05-SEP-2017
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

10-FEB-2023Sanitary Sewer SystemIn Compliance
19-MAR-2020Compliance Eval (non-sampling) (CEI)In Compliance
17-JUL-2017Biosolids InspectionIn Compliance
19-FEB-2016Compliance Eval (non-sampling) (CEI)In Compliance
29-MAY-2013Compliance Eval (non-sampling) (CEI)In Compliance
15-AUG-2012Compliance Sampling (CSI)Complete and Stable
30-SEP-2011Compliance Eval (non-sampling) (CEI)In Compliance
10-MAY-2011Reconnaissance (RI)Complete and Stable
31-DEC-2009Pretreatment TAV and File ReviewOut of Business
18-NOV-2009Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

14.0875DeniedLINEA. Bahour12/1/2014-Woodlawn Drive Sewer Line Relocation
17.0583Review CompleteLINEA. Bahour9/5/2017-Dollar General Store