Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5671Byrdstown STP1099 Spring RoadByrdstownPickettCookeville

Permit Information

TN0062626
Individual
Reissuance
Town of Byrdstown
Byrdstown STP
treatment of municipal sewage by sequenching batch reactor, followed by flow equalization, ultraviolet disinfecting, and step aeration
I
M
MW
07-DEC-2023
28-DEC-2018
27-DEC-2023
06-MAR-2024
08-APR-2024
01-JUL-2024
30-JUN-2029
unnamed tributary at mile 0.25 to Town Creek at mile 0.1
treated municipal wastewater from Outfall 001
increased design capacity; sequenching batch reactor biolgical process preceeded by screening and followed by flow equalization, ultraviolet disinfecting, and step aeration. Residual solids are digested and land applied.
4952
.6
08-JUL-2024 03:41PM

Other DWR permits at this site

Permit Documents

View
LetterRCVD VIA EMAIL 20-NOV-24: letter re: sig auth for James Rigney, by Sam Gibson20-NOV-2024
Inspection ReportCEI28-OCT-2024
ReportPT IWS28-OCT-2024
ReportAugust 2024 Certificate of Analysis 25-SEP-2024
EmailPT IWS Reminder05-SEP-2024
Permitminor modification updating influent parameters & monitoring16-JUL-2024
Old Permitminor modification to include influent monitoring table and update TDEC address03-JUL-2024
Old Permit2024 final NPDES permit08-APR-2024
Draft Permit2024 draft permit06-MAR-2024
SpreadsheetOperator Certification Rating Sheet Updated 202407-FEB-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

21-OCT-2024Sanitary Sewer SystemIn Compliance
10-FEB-2023Sanitary Sewer SystemIn Compliance
19-MAR-2020Compliance Eval (non-sampling) (CEI)In Compliance
17-JUL-2017Biosolids InspectionIn Compliance
19-FEB-2016Compliance Eval (non-sampling) (CEI)In Compliance
29-MAY-2013Compliance Eval (non-sampling) (CEI)In Compliance
15-AUG-2012Compliance Sampling (CSI)Complete and Stable
30-SEP-2011Compliance Eval (non-sampling) (CEI)In Compliance
10-MAY-2011Reconnaissance (RI)Complete and Stable
31-DEC-2009Pretreatment TAV and File ReviewOut of Business

Wastewater Engineering Plans Review

17.0583Review CompleteLINEA. Bahour9/5/2017-Dollar General Store
14.0875DeniedLINEA. Bahour12/1/2014-Woodlawn Drive Sewer Line Relocation