Permit Information

TN0023582
Individual
Reissuance
Knoxville Utilities Board (KUB)
Kuwahee STP
Treatment of municipal sewage via fine screening, aerated grit removal, polymer addition, primary clarification, aeration, final clarification, and chlorine disinfection. Land application of biosolids. Secondary treatment for peak wet weather influent flows by Biologically Enhanced High Rate Clarifier (BEHRC).
M
M
MW
21-APR-2022
10-MAY-2022
16-AUG-2022
06-OCT-2022
01-JAN-2023
31-OCT-2027
31-AUG-2009
Tennessee River mile 646.2
treated municipal wastewater from Outfall 001
fine screening, aerated grit removal, primary clarification, aeration, final clarification, chlorination, and re-aeration; primary & WAS to anaerob. digstrs, filter press, land app.
4952
44
13-DEC-2024 11:35AM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
Letter24.0825 Plans Approval LTR 2024111818-NOV-2024
LetterPT PTL Twn Ltr Eastbridge04-NOV-2024
ReportRCVD VIA EMAIL 30-OCT-24: report re: Annual Wastewater Report from Sept. 2023 to Aug. 2024, by Kevin Keaton30-OCT-2024
LetterWPN24.0779 Approval Letter 2024102525-OCT-2024
LetterWPN24.0765 Approval Letter 2024102224-OCT-2024
LetterWPN24.0762 Approval Letter 2024102224-OCT-2024
LetterWPN24.0608R Approval Letter 2024100404-OCT-2024
Letter24.0686 Plans Approval LTR 2024092323-SEP-2024
LetterWPN24.0609 Approval Letter 2024090405-SEP-2024
Letter24.0481 Approval letter 2024071212-JUL-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:OverflowsAgreed OrderReference "Moratorium" file on H:/4/10/2019Active39

Inspections

26-MAR-2024Pretreatment TAV and File ReviewIn Compliance
19-OCT-2023Compliance Eval (non-sampling) (CEI)In Compliance
23-JAN-2023Pretreatment Compliance (oversight)In Compliance
12-APR-2022Compliance Eval (non-sampling) (CEI)In Compliance
31-JAN-2022Pretreatment TAV and File ReviewIn Compliance
11-AUG-2021Compliance Eval (non-sampling) (CEI)In Compliance
08-FEB-2021Pretreatment Compliance (oversight)In Compliance
11-MAR-2020Pretreatment AuditIn Compliance
18-SEP-2019Compliance Eval (non-sampling) (CEI)In Compliance
12-MAR-2019Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0956ApprovedCDMJT12/19/202412/20/20245204 Malibu Drive LPS Extension
24.0779ApprovedCDTNH10/11/202410/25/2024Woods-Smith Road Gravity Sewer Replacement Project
24.0765ApprovedCDMJT10/2/202410/22/20245208 Malibu Drive LPS Extension
24.0763Incomplete-TNH10/2/2024-Kuwahee WWTP Disinfection Conversion
24.0762ApprovedCDMJT10/2/202410/22/20241550 Peltier Road LPs Extension
24.0608RApprovedCDMJT10/2/202410/4/20243528 Ellistown Road LPS Extension
24.0609PendingCDMJT8/7/20249/4/2024550 Main Street Gravity Sewer Replacement
24.0339ApprovedCDJKM5/3/20246/14/20242850 Barnard Rd LPS Extension
24.0264ApprovedPP-ERTNH4/9/20245/9/2024Kuwahee WWTP Disinfection Conversion
24.0258ApprovedCDJKM4/8/20245/13/2024UGC - Fulton High School Sewer Replacement