4883US Department of Energy, Oak Ridge National Laboratory (ORNL)1 Bethel Valley RoadOak RidgeRoaneKnoxville

Permit Information

TN0002941
Individual
Reissuance
U.S. Department of Energy (DOE)
Oak Ridge National Laboratory (ORNL)
ORNL providing scientific support of USDOE mission- including neutron science, systems biology, energy materials science at the nanoscale, high-performance computing for national security. Permit modification to address 2019 permit appeal of antidegradation, certified operator, waste acceptance policy, plant operation manual, monitoring procedures, radioactive monitoring, and Appendix tables 1 and 2 in rationale.
M
P
PW, SW, NCCW, DW
30-JUN-2023
26-JUL-2023
01-JUN-2021
24-FEB-2023
01-MAR-2023
31-DEC-2023
15-DEC-2022
White Oak Creek, Northwest Tributary, First Creek, Fifth Creek, Melton Branch, Clinch River and other unnamed tributaries
process wastewaters & other wastewaters accepted for discharge via waste acceptance procedures defined in Part III.F of the permit, industrial wastewater, sanitary wastewater, non-process wastewater, and stormwater discharges from wastewater treatment facilities (the Sanitary Treatment Plant/X01 and the Process Waste Treatment Complex/X12), in addition to seventy (70) non-process wastewater outfalls, and one-hundred and thirty-two (132) stormwater outfalls that are located throughout ORNL
aerated lagoons, activated sludge, multimedia filtration, ozone disinfection, land application of sludge
9711
1.795
07-SEP-2023 01:49PM

Other DWR permits at this site

  • 1 - 9 of 9
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR136604Department of EnergyY-12 National Security ComplexCGPActiveN/AKnoxville-30-NOV-202130-SEP-2026
TNR132878Oak Ridge National Laboratory-CGPInactiveN/AKnoxville-14-DEC-2007-
TNR139975Spallation-CGPInactiveN/AKnoxville---
TNR190584Tennessee Valley Authority (TVA)Oak Ridge National Laboratory Construction of 161 & 13kV Trans LineCGPInactiveN/AKnoxville-23-JAN-200630-MAY-2010
TNR190525Tennessee Valley Authority (TVA)Oak Ridge National Laboratory Substation ConstructionCGPInactiveN/AKnoxville-17-JUN-200530-MAY-2010
TNR133329The University of Tennessee-CGPActiveN/AKnoxville-15-OCT-200830-SEP-2026
SOP-23032U.S. Department of Energy (DOE)Oak Ridge National Laboratory (ORNL)SOPNewN/AKnoxville-01-MAY-202430-APR-2029
SOP-22033US Department of Energy, Oak Ridge National LaboratoryGlobal Evaluation, Analysis, Research and Security ProjectSOPNewN/AKnoxville31-JAN-202301-FEB-202331-JAN-2028
TNR131450United States Department of Energy / Oak Ridge National Laboratory-CGPInactiveN/AKnoxville-19-JUL-2005-
  • 1 - 9 of 9

Permit Documents

View
Spreadsheetoutfalls and parameters deleted from database, but not PCS (EEO, 1/17/07)17-JAN-2007
SWPPPREF 31-JUL-06: SWPPP by Douglas Allen31-JUL-2006
ReportRCVD VIA EMAIL 29-APR-24: WQPP annual data and evaluation report by Johnny Moore29-APR-2024
ReportQuarterly Status Report for Process Waste Treatment Complex (PWTC) for Oct - Dec 202320-DEC-2023
ReportRCVD VIA EMAIL 27-JUN-23: report re: Quarterly Status Report for the Process Wastewater Treatment Complex (PWTC) Upgrades by Emily Day27-JUN-2023
ReportRCVD VIA EMAIL 01-MAY-23: report re: water quality protection plan annual data and evaluation by Jerry Lindsay01-MAY-2023
ReportRCVD VIA EMAIL 30-MAR-23: report re: ORRCC-23-0229, quarterly status report by Emily Day30-MAR-2023
ReportRCVD VIA EMAIL 20-DEC-22: report re: quarterly status report by Emily Day20-DEC-2022
ReportQuarterly Status Report for the Process Wastewater Treatment Complex26-SEP-2022
ReportQuarterly Status Report for the Process Wastewater Treatment Complex29-JUN-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

23-JUN-2023Compliance Biomonitoring (CBI)In Compliance
15-JUN-2021Compliance Eval (non-sampling) (CEI)In Compliance
21-JUN-2019Compliance Eval (non-sampling) (CEI)In Compliance
25-MAY-2017Compliance Eval (non-sampling) (CEI)In Compliance
26-SEP-2013Compliance Eval (non-sampling) (CEI)In Compliance
22-SEP-2009Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

09.0289ApprovedPSJMS5/4/20095/18/2009Sanitary Sewer Lift - USDOE - ORNL - Moderization of Laboratory Facilities (MLF)
13.0608ApprovedSTPMODPhil Simmo9/30/201310/15/2013Rotary Fan Sludge Press
15.0207ApprovedPSREA4/2/201510/30/2015USDOE - ORNL Primary Sewage Treatment Pump Project
18.0133ApprovedERGCG3/5/20186/15/2018Adding PAA at the ORNL WWTP
19.0757ApprovedCDJAH11/26/201912/4/2019ORNL 2000-3000 Area Utility
21.0429ApprovedCDZachSeiden5/28/20216/30/2021ORNL -Craft Resources Support Facility
21.0531ApprovedCDTNH7/6/20217/30/2021Mission Support Facility for Oak Ridge National Laboratory
22.0163ApprovedPP-ERTNH3/18/20224/8/2022ORNL- Laboratory STP Modernization
22.0651ApprovedCDTNH10/14/202211/7/2022ORNL Sewage Treatment Plant Modernization
23.0337ApprovedCDMJB7/28/20237/31/2023ORNL -3501 Pump Station Replacement