5744Brownsville Energy Authority WWTP170 W. Cooper St. (T.F.)BrownsvilleHaywoodJackson

Permit Information

TN0062367
Individual
Reissuance
Brownsville Energy Authority
Brownsville Wastewater Treatment - South Plant
Treatment of municipal wastewater from current trickling filter (1.08 MGD) with possible discharge from North Plant lagoon (0.95 MGD) through combined Outfall 001, and in the future discharge from only a sequencing batch reactor (SBR) of the same combined design capacity (2.03 MGD). The applicant determined this equipment replacement will not result in degradation of the receiving stream.
M
M
MW
08-JAN-2024
22-JAN-2024
04-JUN-2024
16-JUL-2024
01-AUG-2024
30-JUN-2029
16-DEC-2022
Hatchie River at mile 76.3
Treated municipal wastewater currently from a trickling filter plant (1.08 MGD) and a separate lagoon treatment plant (0.95 MGD), both discharged through Outfall 001, and in the future only from a sequencing batch reactor (2.03 MGD) through Outfall 001.
One plant features a trickling filter, primary and secondary clarification, and chlorination; the other features an aerated lagoon followed by a two-stage settling lagoon and chlorination.
4952
2.03
29-OCT-2024 07:55PM

Other DWR permits at this site

  • 1 - 5 of 5
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR1702.058Brownsville Energy AuthoritySugar Creek Bank StabilizationARAPInactiveN/AJackson-06-DEC-201705-DEC-2019
NR1502.065Brownsville Energy AuthorityBrownsville 2015 CDBG Sewer System Improvements - Gravity Sewer Crossing of Sugar CreekARAPInactiveN/AJackson30-OCT-201530-OCT-201528-OCT-2016
TNB062367Brownsville STP-BiosolidsInactiveN/AJackson---
TNRX50172Brownsville Wastewater Treatment Facility-TMSPNo ExposureN/AJackson---
NR1302.073State of Tennessee-Dept. of General ServicesTreated Wastewater Force Main - Memphis Regional MegasiteARAPInactiveN/AJackson06-NOV-201306-NOV-201330-JUN-2015
  • 1 - 5 of 5

Permit Documents

View
ModelStreeter Phelps model10-JUL-1985
MemoPlanning limits memo28-AUG-1997
ReportAmendment No. 1 To the 201 Facilities Plan for the City of Brownsville01-DEC-1999
FormTAV 09.30.200811-JAN-2008
Letter09.30.2008 TAV Letter to Brownsville07-OCT-2008
Reportmetals wqbels21-MAR-2010
AudioREF 05-JUN-14: hearing recording05-JUN-2014
EmailEmail regarding the status of Brownsville's order17-JUL-2014
LetterRCVD VIA EMAIL 22-JUL-14: copy of letter to George Chapman re: NTC 2nd to BEA Board FollowUp by Nick Crafton.22-JUL-2014
EmailSENT 22-JUL-14: email to Nick Crafton re: response to NTC 2nd to BEA Board FollowUp by Paul Higgins.22-JUL-2014
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

WWTP at CapacityPrevious order was closed on 9/6/13. It did not contain moratorium language. 9/6/2013Watch List55

Inspections

09-JUL-2024Pretreatment Compliance (oversight)In Compliance
01-AUG-2023Compliance Eval (non-sampling) (CEI)In Compliance
27-JUL-2023Pretreatment TAV and File ReviewIn Compliance
22-JUN-2022Pretreatment Compliance (oversight)In Compliance
24-AUG-2021Compliance Eval (non-sampling) (CEI)In Compliance
28-JUL-2021Pretreatment AuditIn Compliance
28-AUG-2020Pretreatment TAV and File ReviewIn Compliance
20-AUG-2019Compliance Eval (non-sampling) (CEI)In Compliance
13-AUG-2019Pretreatment Compliance (oversight)In Compliance
18-JUL-2018Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0068Review CompleteCDTNH1/29/2024-New Sequencing Batch Reactor Wastewater Treatment Plant
23.0439ApprovedPP-ERTNH8/15/20239/19/2023New Sequencing Batch Reactor Wastewater Treatment Plant
23.0164ApprovedCDA. Bahour3/22/20234/5/2023Wendy's New Build, Oval Landing Subdivision - Lot 1; Brownsville, TN
22.0710ApprovedCDCourtlandV12/20/20221/3/2023Arrowwood Subdivision
22.0648Review CompletePERTNH10/17/202211/4/2022NPDES Permit TN0062367 Modification
22.0080Review CompleteCDTNH3/29/2022-SRF Brownsville Energy Authority WWTP Improvements and I/I Correction
22.0135ApprovedCDMNU3/28/20224/5/2022Anderson Avenue Utility Extension
22.0124Review CompletePPDTNH3/8/2022-Brownsville WWTP Expansion
19.0421ApprovedCDAWJ8/28/20198/28/2019I-40 Advantage Industrial Park Sewer Improvements
17.0155ApprovedLINEMNU2/23/20173/10/2017Ind. Facility Development - Teknor Apex