2348ANR Pipeline Company - Cottage Grove Compressor Station7845 Highway 140 NorthCottage GroveHenryJackson

Permit Information

SOP-99013
SOP
Reissuance
ANR Pipeline Company
Cottage Grove Compressor Station
Oil/water separator, retention pond, and pump and haul of process wastewater and storm water from a natural gas compressor station
N/A
X
SI
26-JUL-2024
14-AUG-2024
28-JAN-2020
01-APR-2020
01-MAY-2020
31-MAR-2025
NA. Activity is near the unnamed tributary at mile 1.0 to Cane Creek at mile 8.5
No discharge allowed
pump and haul system for process water (equipment and vehicle wash pad wastewater) and storm water from a natural gas compressor station, treated in an oil/water separator and collected in a retention pond
4922
.0338
14-AUG-2024 08:57AM

Other DWR permits at this site

  • 1 - 1 of 1
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNG670466ANR Pipeline Company, Cottage Grove Compressor StationANR Pipeline Company, Cottage Grove Compressor StationHydrostaticInactiveN/AJackson08-JAN-201508-JAN-201519-JUN-2015
  • 1 - 1 of 1

Permit Documents

View
Report2/11/2000 Pond Specification11-FEB-2000
Draft Permit2015 Draft Permit (for 2/23/15 PN)23-FEB-2015
Application2019 Application15-JUL-2019
Draft Permit2020 Draft Permit28-JAN-2020
Email2023 August / No Pumping05-SEP-2023
Letter2023 Inspection Letter26-MAY-2023
EmailANR Pipeline Disposal Facility LIst as of 4/4/201804-APR-2018
Inspection ReportANR Pipeline-Cottage Grove; 3/19/13 Inspection, Letter & Trip Report17-APR-2013
ReportANR no pumping April 202004-MAY-2020
LetterApplciation Letter06-JAN-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

23-MAY-2023Compliance Evaluations (non-NPDES)In Compliance
10-APR-2018Compliance Evaluations (non-NPDES)Immediately Corrected During Inspection
19-MAR-2013Compliance Evaluations (non-NPDES)Minor Deficiency Noted
04-DEC-2008Compliance Evaluations (non-NPDES)In Compliance

Wastewater Engineering Plans Review

no data found