Site IDSiteLocationCityCountyEFO Name
4968TVA Allen Fossil Plant D4 Plant Retirement/ Decommissioning and Plant Site Restoration2574 Plant RdMemphisShelbyMemphis

Permit Information

TN0005355
Individual
Reissuance
Tennessee Valley Authority (TVA)
Allen Fossil Plant (ALF)
Administrative continued permit from 2010 expiration. Coal-fired steam-electric plant being replaced in 2018 by NG-fired unit. Renewal of this permit is held pending changeover.
M
P
PW, NPW, CCW, SW
28-JAN-2010
24-FEB-2010
30-NOV-2007
01-JAN-2008
03-AUG-2010
30-NOV-2007
McKellar Lake to mile 725.6 of the Mississippi River (Outfalls 001 and 010), Horn Lake cutoff to McKellar Lake (001A), and Mississippi River at mile 725.0 (002, 003)
ash transport water, treated chemical and nonchemical metal cleaning wastewaters, coal pile runoff, low volume wastes, and storm water runoff from Outfalls 001 and 01A (emergency only), ash transport water, treated chemical and nonchemical metal cleaning wastewaters, precipitator & pad washdown, low volume wastes, and storm water runoff from Outfall 002, once through condenser cooling water, misc. equipment cooling and lubricating water, air preheater wash water, selective catalytic reduction water and chemical and nonchemical metal cleaning wastewaters (IMP 006) and reverse osmosis reject wastewater from Outfall 003 and intake screen backwash water from Outfall 010; operation of Cooling Water Intake Structure
4911
482.3595
18-OCT-2024 06:16AM

Other DWR permits at this site

  • 1 - 25 of 25
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR191856Tennessee Valley Authority (TVA)East and West Ash Pond ClosuresCGPInactiveN/AMemphis-05-DEC-2019-
TNR191760Tennessee Valley Authority (TVA)Allen Fossil Plant Storm Water ReroutesCGPInactiveN/AMemphis-09-OCT-2018-
TNR191746Tennessee Valley Authority (TVA)Allen Fossil Plant Reclamation of Unused Coal and ResidualsCGPInactiveN/AMemphis-28-AUG-2018-
TNR191567Tennessee Valley Authority (TVA)Allen Fossil Plant 161 kV Switchyard ExpansionCGPInactiveN/AMemphis-26-JUL-2016-
TNR191547Tennessee Valley Authority (TVA)Allen Fossil Plant West Ash Pond Final ClosureCGPInactiveN/AMemphis-06-JUL-2016-
TNR192155Tennessee Valley Authority (TVA)TVA Allen Fossil Plant D4 Decommissioning and Site RestorationCGPActiveN/AMemphis-01-OCT-202430-SEP-2026
TNR192266Tennessee Valley Authority (TVA)ACT D4 Demolition and Site RestorationCGPInactiveN/AMemphis-12-MAR-202430-SEP-2026
TNR191994Tennessee Valley Authority (TVA)Allen Fossil Plant Interim Response ActionCGPActiveN/AMemphis-01-JUL-202030-SEP-2026
TNR053184Tennessee Valley Authority (TVA)Allen Fossil PlantTMSPActiveN/AMemphis19-JUL-202020-JUL-202030-JUN-2025
TN0082228Tennessee Valley Authority (TVA)Allen Fossil Plant - Final Closure of Ash PondsConst-IndividualNewMinorMemphis26-MAY-202001-JUN-202031-MAY-2025
NRS22.130Tennessee Valley Authority (TVA)West Ash Pond Stormwater Outfalls ConstructionARAPActiveN/AMemphis-22-JUN-202207-APR-2025
NRS20.012Tennessee Valley Authority (TVA)West Ash Pond Storm Water Outfalls ConstructionARAPInactiveN/AMemphis-12-FEB-202006-APR-2021
NRS16.258Tennessee Valley Authority (TVA)TVA-Allen Fossil Plant Levee Seep Repair - Installation of 300 ft of Graded Filter at McKellar LakeARAPInactiveN/AMemphis09-DEC-201609-DEC-201606-APR-2020
NRS16.169Tennessee Valley Authority (TVA)Allen Fossil Plant - West Ash Pond Closure - Construction of Stormwater Outfall at McKellar LakeARAPInactiveN/AMemphis11-AUG-201611-AUG-201606-APR-2020
NRS15.216Tennessee Valley Authority (TVA)TVA Allen Fossil Plant - Barge Mooring Cell Restoration at McKellar LakeARAPInactiveN/AMemphis18-AUG-201518-AUG-201506-APR-2020
NRS12.142Tennessee Valley Authority (TVA)Allen Fossil Plan - Recovery of Coal from McKellar LakeARAPInactiveN/AMemphis16-JUL-201216-JUL-201215-JUL-2017
NRS14.235Tennessee Valley Authority (TVA)TVA Allen Fossil Fuel Plant - Bank Stabilization of McKellar LakeARAPInactiveMajorMemphis19-SEP-201419-SEP-201430-JUN-2015
NRS11.179Tennessee Valley Authority (TVA)Allen Fossil Plant - Restoring Mooring CellsARAPInactiveN/AMemphis10-AUG-201110-AUG-201109-AUG-2014
NR1205.011Tennessee Valley Authority (TVA)-ARAPInactiveN/AMemphis14-MAR-201214-MAR-201213-MAR-2014
NRS10.128Tennessee Valley Authority (TVA)-ARAPInactiveN/AMemphis10-JUN-201010-JUN-201009-JUN-2013
NRS09.238Tennessee Valley Authority (TVA)Allen Fossil PlantARAPInactiveN/AMemphis18-AUG-200918-AUG-200917-AUG-2012
NRS05.305Tennessee Valley Authority (TVA)Allen Fossil PlantARAPInactiveMinorMemphis05-JAN-200604-JAN-200604-JAN-2011
TNR190557Tennessee Valley Authority (TVA)Allen Fossil PlantCGPInactiveN/AMemphis-14-OCT-200530-MAY-2010
NR0705.045Tennessee Valley Authority (TVA)-ARAPInactiveN/AMemphis14-JUN-200714-JUN-200713-JUN-2009
NRS07.061Tennessee Valley Authority (TVA)Allen Fossil PlantARAPInactiveN/AMemphis19-MAR-200719-MAR-200731-OCT-2008
  • 1 - 25 of 25

Permit Documents

View
LetterDelegation of signatory authority General Manager Gas Operations, Regional Gas Operations Senior Managers, Plant Manager Integrated CC and CT Site, and Operations Managers15-AUG-2024
ReportRCVD VIA EMAIL 30-JAN-24: report re: annual summary of quarterly red water seep inspections by Angela Austin - no seeps observed30-JAN-2024
ReportRCVD VIA EMAIL 21-SEP-23: report re: ALF-UCC Weekly Summary Reports for weeks ending 9.16.2023 from Callan Pierson21-SEP-2023
ReportTN0005355 2022 Red Water Seep Report30-JAN-2023
ReportRCVD VIA EMAIL 27-JAN-23: report re: red water seep by Angela Austin27-JAN-2023
Monitoring ReportWeekly Water Treatment System Reports 202317-JAN-2023
Inspection ReportTN0005355 2021 Red Water Seep Report31-JAN-2022
Monitoring ReportWeekly Water Treatment System Reports 202212-JAN-2022
Monitoring ReportWeekly Water Treatment System Reports 202131-AUG-2021
ReportCEI Report30-AUG-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

29-AUG-2024Compliance Eval (non-sampling) (CEI)In Compliance
11-AUG-2021Compliance Eval (non-sampling) (CEI)In Compliance
30-APR-2019Compliance Eval (non-sampling) (CEI)In Compliance
31-AUG-2017Compliance Eval (non-sampling) (CEI)In Compliance
09-SEP-2015Compliance Eval (non-sampling) (CEI)In Compliance
05-FEB-2013Compliance Eval (non-sampling) (CEI)In Compliance
10-APR-2012Compliance Biomonitoring (CBI)In Compliance
19-MAY-2011Reconnaissance (RI)Complete and Stable
21-APR-2011Compliance Eval (non-sampling) (CEI)In Compliance
20-APR-2009Compliance Biomonitoring (CBI)In Compliance

Wastewater Engineering Plans Review

no data found