23233Martin Marietta Materials, Inc dba I-75 Quarry (East)1949 East Racoon Valley DriveHeiskellKnoxKnoxville

Permit Information

TN0079341
Mining
Transferred to DMGR
BWI ETN LLC dba Blue Water Industries
BWI I-75, LLC Quarry (East)
Limestone quarry and processing facility with asphalt plant
I
R
PW, SW
12-JUL-2019
12-JUL-2019
12-JUL-2019
27-NOV-2019
01-JAN-2020
31-DEC-2024
Unnamed Trib to Whitcox Branch (001), UNTs to Andy Branch (002, 003, 004)
treated mine wastewater and storm water
Settling/Treatment Ponds and BMPs
1422
22-JUL-2024 04:12PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR056817APAC-Atlantic, Inc.APAC Atlantic, Inc. Harrison Division/Raccoon ValleyTMSPActiveN/AKnoxville19-JUL-202020-JUL-202030-JUN-2025
TNG110385Ready Mix USA - I-75 Concrete Plant-RMCPInactiveN/AKnoxville15-JAN-201315-JAN-201331-OCT-2017
  • 1 - 2 of 2

Permit Documents

View
Inspection ReportSupplemental Inspection Report - In Compliance 09-AUG-2023
LetterNotification and Explanation for O&G Excursion at Stormwater Point SW0110-JAN-2022
PermitFinal NPDES Permit27-NOV-2019
AddendumSigned plans approval25-NOV-2019
Public Notice DocumentPublic Notice14-AUG-2019
Draft PermitDraft NPDES Permit09-AUG-2019
Inspection ReportInsp Report29-JUL-2019
ApplicationApplication10-JUL-2019
Letter2nd Notice of NPDES Permit Expiration 29-APR-2019
Inspection ReportInsp Report23-APR-2019
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

14-MAY-2008Compliance Eval (non-sampling) (CEI)Not Complete and/or Stable
30-MAY-2008Compliance Eval (non-sampling) (CEI)Not Complete and/or Stable
16-JUL-2008Compliance Eval (non-sampling) (CEI)Not Complete and/or Stable
22-JUL-2008Compliance Eval (non-sampling) (CEI)Not Complete and/or Stable
05-NOV-2008Compliance Eval (non-sampling) (CEI)In Compliance
10-FEB-2009Compliance Eval (non-sampling) (CEI)Follow-up Inspection Required
27-FEB-2009Compliance Eval (non-sampling) (CEI)In Compliance
04-JUN-2009Compliance Eval (non-sampling) (CEI)In Compliance
15-SEP-2009Compliance Eval (non-sampling) (CEI)Follow-up Inspection Required
02-DEC-2009Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted

Wastewater Engineering Plans Review

no data found