Site IDSiteLocationCityCountyEFO Name
12253Town of Thompson's Station - Regional WWTP4549 COLUMBIA PIKETHOMPSONS STNWilliamsonNashville

Permit Information

SOP-04058
SOP
Modification
Town of Thompson's Station
Thompson's Station Regional Treatment Facility
Improvements include upgraded influent pumping, new headworks screening, influent equalization using Cell 2, new aeration basins and MBR, UV disinfection, aerobic digestion, and solids dewatering. Modification extends the reuse compliance schedule 1 year.
N/A
M
DI, RU
31-AUG-2021
13-SEP-2021
14-SEP-2021
19-JAN-2022
19-JAN-2022
30-SEP-2025
N/A
No discharge allowed from this system also permitted for unrestricted non-potable reuse
grinder pump, low pressure collection system, aerated treatment/storage lagoons (sheaffer), MBR, aerobic digestion, disc filters, UV disinfection and drip irrigation
.8112
26-NOV-2024 08:48AM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR2404.287Town of Thompson's StationHighway 31 Gravity Sewer ImprovementsARAPActiveN/ANashville-27-NOV-2024-
TNR247125Town of Thompson's StationThompson's Station Regional Wastewater Treatment Plant UpgradesCGPActiveN/ANashville-27-DEC-2023-
NR2104.197Town of Thompson's StationThompson's Station Regional Wastewater Treatment Plant - 14 inch sewer main, 6-inch water lineARAPActiveN/ANashville-10-SEP-202107-APR-2025
  • 1 - 3 of 3

Permit Documents

View
Letter16-0028 Letter02-FEB-2016
Engineering Calculations16-0028 Ref29-JAN-2016
Letter16-0062 Letter16-FEB-2016
Engineering Calculations16-0062 Ref12-FEB-2016
Engineering Calculations16-0062 Ref112-FEB-2016
Letter16-0382 Letter16-JUN-2016
Letter16-0382 Ref10-JUN-2016
Letter16-0382 Ref215-JUN-2016
Letter16-0569 Letter09-AUG-2016
Letter16-0569 Ref08-AUG-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

11-MAR-2024Compliance Evaluations (non-NPDES)Out of Compliance
28-MAR-2023Compliance Evaluations (non-NPDES)In Compliance
02-MAY-2017Compliance Evaluations (non-NPDES)In Compliance
04-AUG-2010Compliance Evaluations (non-NPDES)NOV

Wastewater Engineering Plans Review

24.0795IncompleteCDMJB10/23/2024-Highway 31 Gravity Sewer Improvements
24.0634Pending-TNH8/15/202410/16/2024Tollgate Town Center, Section 3
24.0631Review CompletePPDTNH8/6/2024-Armstrong Garden Center
24.0600PendingCDRGO8/5/20248/20/2024Thompson's Station Regional WWTP Upgrades - Phase 2
24.0513PendingCDMJB7/3/202411/4/2024Garrett Farms
24.0344Inactive-TNH5/6/2024-Highway 31 Gravity Sewer
23.0424PendingCDTNH8/8/20233/1/2024Station Hill - Phase 1
23.0313PendingCDTNH6/15/202310/6/2023Whistle Stop Section 2 thru 5
21.0541R4Review CompleteCDRGO3/20/2023-Thompson's Station Regional Wastewater Plant Improvements
21.0541R3Review CompleteCDRGO3/17/2023-Thompson's Station Regional Wastewater Plant Improvements