Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5945Gordonsville STP101 Blair RoadSouth CarthageSmithCookeville

Permit Information

TN0067733
Individual
Reissuance
Town of Gordonsville
Gordonsville STP
treatment of domestic wastewater by activated sludge process
I
M
MW
28-SEP-2023
27-SEP-2023
28-SEP-2023
27-DEC-2023
30-JAN-2024
01-JUN-2024
31-MAY-2029
Cumberland River (Old Hickory Reservoir) at mile 308.3
treated municipal wastewater from Outfall 001
Activated sludge
4952
.325
08-JUL-2024 03:41PM

Other DWR permits at this site

Permit Documents

View
LetterPT IWS Follow up31-JUL-2024
MemoWPN24.0397 ARP Memo 2024061311-JUL-2024
LetterWPN24.0408 Approval Letter 2024070203-JUL-2024
FormPT IWS15-MAR-2024
PermitFinal permit; Issue 1/30/2430-JAN-2024
Draft PermitDraft permit; PN 12/27/2327-DEC-2023
LetterRCVD VIA EMAIL 02-OCT-23: letter re: sig auth for Stevie Gentry by John Potts02-OCT-2023
ApplicationRCVD VIA EMAIL 12-SEP-23: NPDES app by John Potts with clarifications received of Michael Ray on 28-SEP-23.28-SEP-2023
Letter22.0257 Extension Letter27-JUL-2023
Letter22.0256 App Letter03-AUG-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

01-NOV-2007Compliance Eval (non-sampling) (CEI)In Compliance
11-JUN-2009Compliance Sampling (CSI)In Compliance
18-DEC-2009CSO Inspection Non-SamplingComplete and Stable
28-MAY-2010Compliance Eval (non-sampling) (CEI)In Compliance
27-JUL-2010Reconnaissance (RI)Complete and Stable
27-APR-2011Compliance Eval (non-sampling) (CEI)In Compliance
08-JUN-2011Compliance Sampling (CSI)In Compliance
14-DEC-2011Compliance Sampling (CSI)Minor Deficiency Noted
31-JAN-2013Compliance Eval (non-sampling) (CEI)In Compliance
24-MAR-2014Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

13.0609ApprovedIMPA. Bahour9/30/201310/18/2013Highway 53 Lift Station Modifications
15.0435Approved-MNU7/16/20158/28/2015Cedar Pointe Subdivision
15.0664Approved-VMJ10/15/201510/16/2015SRF - Sewer System Extension for Spring Valley and Meadow Drive Area
16.0156ApprovedotherJim McAdoo2/29/20163/7/2016SRF Contract 1
16.0418Approved-MNU5/31/20166/17/2016Meadow Drive Area Phase II
17.0176Approved-MNU3/1/20173/17/2017Proposed Cedar Pointe S/D
17.0279Approved-A. Bahour5/16/20175/18/2017Meadow Drive Area, Phase 3
18.0257ApprovedLINEMNU4/23/20185/15/2018Proposed Collection System Expansion Phase IV
19.0470ApprovedCDA. Bahour9/5/20199/5/2019Eatherly Landholdings
19.0759ApprovedCDMNU12/2/201912/26/2019Gordonsville Sewer System Phase 5