Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
4883
US Department of Energy, Oak Ridge National Laboratory (ORNL)
1 Bethel Valley Road
Oak Ridge
Roane
Knoxville
Permit Information
Permit Number
TN0002941
Permit Type
Individual
Status
Reissuance
Permittee Name
U.S. Department of Energy (DOE)
Project Name
Oak Ridge National Laboratory (ORNL)
Activity Description
ORNL providing scientific support of USDOE mission- including neutron science, systems biology, energy materials science at the nanoscale, high-performance computing for national security. Permit modification to address 2019 permit appeal of antidegradation, certified operator, waste acceptance policy, plant operation manual, monitoring procedures, radioactive monitoring, and Appendix tables 1 and 2 in rationale.
Permit Rating
M
Facility Classification
P
Discharge Code
PW, SW, NCCW, DW
Application Received
30-JUN-2023
Application Returned
Application Complete
26-JUL-2023
Public Notice Date
01-JUN-2021
Issuance Date
24-FEB-2023
Effective Date
01-MAR-2023
Expiration Date
31-DEC-2023
Modification Date
15-DEC-2022
Termination Date
Receiving Stream
White Oak Creek, Northwest Tributary, First Creek, Fifth Creek, Melton Branch, Clinch River and other unnamed tributaries
Effluent Description
process wastewaters & other wastewaters accepted for discharge via waste acceptance procedures defined in Part III.F of the permit, industrial wastewater, sanitary wastewater, non-process wastewater, and stormwater discharges from wastewater treatment facilities (the Sanitary Treatment Plant/X01 and the Process Waste Treatment Complex/X12), in addition to seventy (70) non-process wastewater outfalls, and one-hundred and thirty-two (132) stormwater outfalls that are located throughout ORNL
Treatment Description
aerated lagoons, activated sludge, multimedia filtration, ozone disinfection, land application of sludge
SIC Code
9711
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
1.795
Record Last Updated
07-SEP-2023 01:49PM
Other DWR permits at this site
Go
Actions
1 - 8 of 8
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
TNR132878
Oak Ridge National Laboratory
-
CGP
Inactive
N/A
Knoxville
-
14-DEC-2007
-
TNR139975
Spallation
-
CGP
Inactive
N/A
Knoxville
-
-
-
TNR190584
Tennessee Valley Authority (TVA)
Oak Ridge National Laboratory Construction of 161 & 13kV Trans Line
CGP
Inactive
N/A
Knoxville
-
23-JAN-2006
30-MAY-2010
TNR190525
Tennessee Valley Authority (TVA)
Oak Ridge National Laboratory Substation Construction
CGP
Inactive
N/A
Knoxville
-
17-JUN-2005
30-MAY-2010
TNR133329
The University of Tennessee
-
CGP
Active
N/A
Knoxville
-
15-OCT-2008
30-SEP-2026
SOP-23032
U.S. Department of Energy (DOE)
Oak Ridge National Laboratory (ORNL)
SOP
New
N/A
Knoxville
04-APR-2024
01-MAY-2024
30-APR-2029
SOP-22033
US Department of Energy, Oak Ridge National Laboratory
Global Evaluation, Analysis, Research and Security Project
SOP
New
N/A
Knoxville
31-JAN-2023
01-FEB-2023
31-JAN-2028
TNR131450
United States Department of Energy / Oak Ridge National Laboratory
-
CGP
Inactive
N/A
Knoxville
-
19-JUL-2005
-
1 - 8 of 8
Column Actions
Search
Permit Documents
Search All Documents
View Permit
FileNet Documents
View
File Type
Description
Document Date
Email
ORNL STP Modernization schedule update
03-OCT-2024
Report
RCVD VIA EMAIL 29-APR-24: WQPP annual data and evaluation report by Johnny Moore
29-APR-2024
Letter
23.0510 Approval letter 20240105
05-JAN-2024
Report
Quarterly Status Report for Process Waste Treatment Complex (PWTC) for Oct - Dec 2023
20-DEC-2023
Letter
23.0380 Approval letter
28-SEP-2023
Letter
23.0510 Utility Approval letter
11-SEP-2023
Inspection Report
CEI Letter June 2023
02-AUG-2023
Bio-monitoring
Biomonitoring X01
31-JUL-2023
Letter
23.0337 Approval letter 20230731
31-JUL-2023
Bio-monitoring
Biomonitoring X12
07-JUL-2023
row(s) 1 - 10 of 224
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Moratorium
no data found
Inspections
Inspection Date
Type
Result
23-JUN-2023
Compliance Biomonitoring (CBI)
In Compliance
15-JUN-2021
Compliance Eval (non-sampling) (CEI)
In Compliance
21-JUN-2019
Compliance Eval (non-sampling) (CEI)
In Compliance
25-MAY-2017
Compliance Eval (non-sampling) (CEI)
In Compliance
26-SEP-2013
Compliance Eval (non-sampling) (CEI)
In Compliance
22-SEP-2009
Compliance Eval (non-sampling) (CEI)
In Compliance
row(s) 1 - 6 of 6
Wastewater Engineering Plans Review
Project no
Plans Status
Type
Reviewer
Date Received
Approved Date
Project Name
24.0229
Review Complete
PPD
MJT
3/20/2024
4/2/2024
ORNL Electrical Substation 0901 Holding Tank
23.0510
Pending
CD
MJB
9/11/2023
1/5/2024
ORNL 6000 East Parking Lots
23.0337
Pending
CD
MJB
6/28/2023
7/31/2023
3501 Pump Station Replacement
22.0409
Review Complete
CD
TNH
6/20/2022
-
ORNL STP Modernization Phase 2
22.0163
Approved
PP-ER
TNH
3/18/2022
4/8/2022
ORNL- Laboratory STP Modernization
21.0531
Approved
CD
TNH
7/6/2021
7/30/2021
Mission Support Facility for Oak Ridge National Laboratory
21.0429
Approved
CD
ZachSeiden
5/28/2021
6/30/2021
ORNL -Craft Resources Support Facility
20.0328
Review Complete
PPD
AWJ
5/22/2020
-
ORNL - STP Modernization
19.0803
Inactive
CD
JAH
12/17/2019
-
Oak Ridge 3501 Pump Station and Line Replacement
19.0757
Approved
CD
JAH
11/26/2019
12/4/2019
ORNL 2000-3000 Area Utility
row(s) 1 - 10 of 14