Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5854Smithville STP1100 Evins Mill RoadSmithvilleDeKalbCookeville

Permit Information

TN0065358
Individual
Reissuance
City of Smithville
Smithville STP
Treatment of municipal wastewater by the sequencing batch reactor activated sludge process with chlorine disinfecting
M
M
MW
12-JUL-2022
23-JUN-2022
12-JUL-2022
02-AUG-2022
06-SEP-2022
01-OCT-2022
30-SEP-2027
Fall Creek at mile 4.7
treated municipal wastewater from Outfall 001
Sequencing batch reactor activated sludge preceded by bar screening and grit removal, and followed by chlorination, flow equalization and de-chlorination; Biosolids are aerobically digested for land application disposal.
4952
2.16
11-JUL-2024 02:40PM

Other DWR permits at this site

  • 1 - 2 of 2
  • 1 - 2 of 2

Permit Documents

View
ReportREF 12-MAR-79: report re: streamflow by DWA.12-MAR-1979
ReportREF 11-AUG-89: report re: waste load allocation by Jim Greenfield.11-AUG-1989
ReportREF 19-JUN-98: report re: stream modeling by Sherry Wang.19-JUN-1998
EmailREF 01-JAN-01: report re: calculation for 7Q10 summer / winter streamflow by Souraya Fathi.01-JAN-2001
EmailREF 22-MAY-02: email re: instream biological surveys by Jimmy Smith.22-MAY-2002
ReportREF 28-NOV-06: report re: benthic macroinvertebrate survey for Fall Creek by Pennington & Associates.28-NOV-2006
ReportREF 01-JAN-07: water quality assessment summary by TDEC.01-JAN-2007
ReportSmithville STP DO Study 2006 data13-SEP-2007
Memofile memo sludge site visit Feb 200804-FEB-2008
Memo2006 DO and Benthic Study Summary Smithville STP Fall Creek20-JUN-2008
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

29-MAY-2023Compliance Biomonitoring (CBI)In Compliance
09-OCT-2016Compliance Biomonitoring (CBI)In Compliance
21-MAR-2011Compliance Biomonitoring (CBI)In Compliance
03-DEC-2020Compliance Eval (non-sampling) (CEI)In Compliance
20-DEC-2018Compliance Eval (non-sampling) (CEI)In Compliance
11-DEC-2014Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
26-MAR-2012Compliance Eval (non-sampling) (CEI)In Compliance
15-JAN-2009Compliance Eval (non-sampling) (CEI)In Compliance
11-DEC-2007Compliance Eval (non-sampling) (CEI)In Compliance
07-MAR-2006Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0050ApprovedCDTNH1/22/20242/7/2024Sewer System Improvements
23.0480ApprovedCDMJB10/19/202310/20/2023TOM VICKERS ESTATE
23.0017ApprovedCDMJB1/9/20231/25/2023Smithside Acres (48 lots)
22.0597ApprovedCDA. Bahour10/21/202210/24/2022Lee Bond Subdivision
21.0503ApprovedCDMNU6/28/20217/23/2021Robinson Square Subdivision Phase 1
20.0565ApprovedCDMNU9/17/202010/13/2020Beckham Way Phase 1 Subdivision
20.0192ApprovedCDA. Bahour4/15/20204/15/2020Jesus Villa
19.0392ApprovedCDMNU7/5/20197/17/2019Sewer and Force Main Line Relocation
19.0194ApprovedCDA. Bahour5/2/20195/2/2019Tuckers Landing Subdivision Sewer Line
12.0519Review CompletePERJMS7/26/20128/16/2012CDBG-2012 - Smithville Sewer System Improvements Project