Site IDSiteLocationCityCountyEFO Name
5143Hallsdale Powell Utility District STP4301 West Beaver Creek DrivePowellKnoxKnoxville

Permit Information

TN0078905
Individual
Reissuance
Hallsdale Powell Utility District
Hallsdale Powell Utility District STP
Treatment of municipal wastewater and inflow and infiltration via parallel treatment trains and influent equalization and storage
M
M
MW
31-JUL-2023
01-AUG-2023
22-AUG-2023
02-OCT-2023
01-NOV-2023
30-SEP-2028
Beaver Creek at mile 23.5
treated municipal wastewater from outfall 001
6.0 MGD membrane biological reactor preceded by fine screens operating parallel with a 3.7 MGD oxidation ditch train followed by UV disinfection, and post aeration. Flow in excess of 11.9 MGD routed to storage for delayed treatment.
4952
9.7
14-JUN-2024 03:35PM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB024287Hallsdale Powell Utility District STP-BiosolidsInactiveN/AKnoxville---
TNR056667Hallsdale Powell Utility District STP-TMSPActiveN/AKnoxville19-JUL-202020-JUL-202030-JUN-2025
TN0024287Hallsdale Powell Utility District STP-IndividualInactiveMajorKnoxville31-MAR-200301-MAY-200331-MAR-2008
  • 1 - 3 of 3

Permit Documents

View
SpreadsheetWPN 19.0465 HPUD WWTP Process Control 13-AUG-2019
ReportHPUD 5 Day SSO #7412-MAY-2021
Report5 day report for Overflow #7327-APR-2021
ReportHPUD overflow report #7220-APR-2021
ReportAR _FINAL_2019_Updated0608202008-JUN-2020
ReportAR _FINAL_2019_Updated0608202008-JUN-2020
ReportHPUD_2018_CMOM_AnnualReport02-APR-2019
ReportHPUD CMOM Annual Report for CY 201630-MAR-2017
ReportWPC14-0044 Hallsdale Powell TN0078905 CMOM AR 01APR1601-APR-2016
ReportREF 30-DEC-15: report re: design development report for WPN15-0865 for solids handling improvements by Gary Cosby.30-DEC-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/IEFO CommunicationHDPUD acknowledged the existence of a Self-Imposed Moratorium (SIM) in a letter from Jacobs Engineering, July 7, 2015 requesting a waiver of the SIM based on approval of the CAP-ER. May 23, 2016, Compliance Enforcement approved the CAP-ER and included language "Implementation of CAP-ER will enable compliance with the self-imposed moratorium language in the NPDES Permit...". The CAP-ER requires HPUD to certify new connections based on hydraulic modeling. In a July 2019 meeting between KEFO and HDPUD, it was agreed that HDPUD would include a certifying statement in all plans submitted that hydraulic modeling had been done and validated the system can handle the added flows. Robert Ramsey email dated 4/16/194/17/2019Active58

Inspections

29-MAY-2024Compliance Sampling (CSI)Pending
21-SEP-2022Compliance Eval (non-sampling) (CEI)In Compliance
18-AUG-2020Compliance Eval (non-sampling) (CEI)In Compliance
25-MAR-2019Compliance AssistanceIn Compliance
06-SEP-2018Compliance Eval (non-sampling) (CEI)In Compliance
08-JUN-2017Compliance Eval (non-sampling) (CEI)In Compliance
03-MAR-2016Compliance Eval (non-sampling) (CEI)In Compliance
26-MAR-2014Compliance Eval (non-sampling) (CEI)Order Requested
22-AUG-2013Compliance Eval (non-sampling) (CEI)In Compliance
31-MAR-2011Compliance Biomonitoring (CBI)In Compliance

Wastewater Engineering Plans Review

24.0317ApprovedCDRGO4/25/20245/1/2024Neely Landing
24.0049ApprovedCDRGO1/22/20241/24/2024Vincent Landing Sewer Extension
24.0018ApprovedCDRGO1/8/20241/12/2024JW Construction on Brown Gap Rd (25507)
23.0655ApprovedCDMJT11/9/20233/18/2024Mesana Investments - Beeler Road
23.0520ApprovedCDJKM9/14/202310/5/2023Mayhew property subdivision
23.0509ApprovedCDMJT10/6/202310/10/2023Preserve at Hines Branch (25434-1)
23.0501ApprovedCDTNH9/6/202310/4/2023FY23-24 ARPA Funded Sewer Rehabilitation
23.0479ApprovedCDA. Bahour8/31/202310/19/2023Gravity Sewer Line Extension Ella's Place
23.0471ApprovedCDMJB10/17/202310/17/2023Gravity Sewer Extension for The Villas at Rogers Farm
23.0396ApprovedCDMJB7/28/20238/25/2023Kidd Farm