Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5045Dyer STP199 Becton DriveDyerGibsonJackson

Permit Information

TN0021563
Individual
Reissuance
City of Dyer
Dyer STP
Treatment of municipal sewage by extended aeration activated sludge (oxidation ditch) and chlorine disinfection
I
M
MW
01-FEB-2022
16-FEB-2022
19-APR-2022
20-MAY-2022
01-AUG-2022
31-JUL-2027
Sand Creek at mile 1.6
treated municipal wastewater from Outfall 001
Extended aeration activated sludge (oxidation ditch), chlorine disinfecting. Sludge is dried on beds.
4952
.675
08-JUL-2024 03:49PM

Other DWR permits at this site

Permit Documents

View
LetterWPN24.0558 Approval Letter 2024073131-JUL-2024
MemoCertified Operators in Charge 202424-JUL-2024
MemoWPN24.0415 ARP Memo 2024061818-JUN-2024
Inspection ReportDyer STP CEI 202416-MAY-2024
MemoWPN24.0094 ARP Memo 2024022626-FEB-2024
LetterLetter of Notification for Self-Imposed Moratorium 202412-FEB-2024
Letter23.0620 Approval letter29-NOV-2023
EmailDyer COIDC 202328-JUL-2023
LetterPT IWS 202228-NOV-2022
PermitFinal NPDES Permit 202220-MAY-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetter607 North Main Street and the Becton Street lift station running parallel to Sand Creek has reported 15 overflows to our MyTDEC system since 9/1/2023-- the permit conditions requiring a self-imposed moratorium have been met.2/13/2024Active72
I/I4 overflows between July 2011 and January 2013. Removed from moratorium list by PMS on 4/3/13.4/3/2013Closed72

Inspections

26-APR-2007Compliance Eval (non-sampling) (CEI)In Compliance
25-JUN-2007Compliance Eval (non-sampling) (CEI)In Compliance
15-AUG-2007Reconnaissance (RI)Complete and Stable
17-OCT-2008Compliance Eval (non-sampling) (CEI)Follow-up Inspection Required
17-FEB-2009Reconnaissance (RI)In Compliance
30-SEP-2009Pretreatment TAV and File ReviewFollow-up Inspection Required
19-NOV-2009Pretreatment TAV and File ReviewIn Compliance
09-DEC-2009Reconnaissance (RI)In Compliance
17-MAR-2010Pretreatment TAV and File ReviewIn Compliance
14-APR-2010Reconnaissance (RI)In Compliance

Wastewater Engineering Plans Review

24.0558ApprovedCDTNH7/24/217/31/2024City of Dyer - 2022-8879 - WW-PDC-2 - Wastewater Collection System - Investigation & Lining
24.0415Review CompletePERTNH5/27/20246/18/20242022-8879 City of Dyer ARP Preliminary Engineering Report
24.0094Review CompletePERTNH2/7/20242/26/2024City of Dyer I&I Reduction Plan
23.0620ApprovedCDA. Bahour10/30/202311/29/2023City of Dyer Sewer Line Replacement
14.0165ApprovedIMPA. Bahour3/19/20144/28/20142013 CDBG for Sanitary Sewer Improvements
13.0288Review CompletePERJMS5/29/20137/3/20132013 CDBG - Dyer Sewer System Improvements