Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5749Munford Sewer Department Lagoon1397 Munford Ave.MunfordTiptonMemphis

Permit Information

TN0062499
Individual
Modification
City of Munford
Munford Sewer Department Lagoon
Treatment of municipal sewage; Modification adds limits for a proposed expansion of the lagoon from 2.0 MGD to 3.0 MGD. Munford has determined that an increase in 1.0 MGD will be less than de minimis degradation of the river because of the river's size; The upgrade may warrant replacement of the outfall line.
M
M
MW
01-APR-2024
25-MAR-2024
17-MAY-2024
02-JUL-2024
02-DEC-2020
01-JAN-2021
31-DEC-2025
Mississippi River at mile 761
treated municipal wastewater from Outfall 001 from a lagoon with chlorine disinfecting serving Munford and the Towns of Atoka and Brighton
lagoon system (exempt from 503)
4952
2
02-JUL-2024 08:14AM

Other DWR permits at this site

Permit Documents

View
LetterAppeal of permit limits19-OCT-2010
FormRCVD 21-JAN-15: form re: permit contact information by unsigned.21-JAN-2015
ReportCEI Report19-MAR-2015
LetterResponse letter16-APR-2015
ApplicationRCVD 28-APR-15: NPDES app by Dwayne Cole.28-APR-2015
LetterIncomplete Application Letter26-MAY-2015
ApplicationRCVD 15-JUL-15: part of NPDES app by unsigned.15-JUL-2015
Draft PermitDraft Permit 201521-SEP-2015
Old PermitFinal TN0062499 (2015)04-NOV-2015
EmailNetDMR Final Approval24-FEB-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

24-OCT-2022Performance Audit (PAI)In Compliance
03-OCT-2022Sanitary Sewer SystemIn Compliance
13-NOV-2020Compliance Eval (non-sampling) (CEI)In Compliance
23-MAY-2019Compliance Eval (non-sampling) (CEI)In Compliance
01-FEB-2017Compliance Eval (non-sampling) (CEI)In Compliance
01-FEB-2017Sanitary Sewer Overflow Non-SamplingIn Compliance
11-MAR-2015Compliance Eval (non-sampling) (CEI)In Compliance
06-FEB-2013Compliance Eval (non-sampling) (CEI)In Compliance
08-MAR-2011Compliance Eval (non-sampling) (CEI)In Compliance
27-APR-2009Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

23.0449ApprovedCDTNH10/25/202311/21/2023Bell Park Subdivision
22.0328ApprovedCDA. Bahour8/22/20228/31/2022Villages of Green Meadows Subdivision 4A
22.0083Review CompleteCDTNH2/28/2022-SRF Giltedge Road
21.0695Review CompleteCDTNH9/27/202110/8/2021SRF Munford Lagoon Influent Pump Upgrade
21.0647ApprovedCDMNU11/9/202111/9/2021Walker Meadows North
21.0382ApprovedCDMNU5/12/20216/7/2021Glenview Estates Section D
19.0562ApprovedCDA. Bahour11/8/201911/18/2019Walker Meadows Subdivision - Phase 2
18.0094RApprovedCDMJB6/9/20236/20/2023Villages of Green Meadows Phase 3
18.0294ApprovedFMMNU5/3/20185/30/2018Quality Tire Subdivision
13.0219ApprovedFMJMS5/2/20136/7/2013Village of Green Meadows P.D.