Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5538Oneida STP1690 O&W RoadOneidaScottKnoxville

Permit Information

TN0064424
Individual
Reissuance
Town of Oneida
Oneida STP
Treatment of municipal sewage via oxidation ditch followed by chlorination, de-chlorination and cascade-aeration
I
M
MW
22-APR-2024
19-APR-2024
23-APR-2024
30-APR-2024
10-JUN-2024
01-SEP-2024
31-AUG-2029
Pine Creek at mile 7.2
treated municipal wastewater from Outfall 001
Oxidation ditch preceded by screening and grit removal and followed by chlorine disinfecting and cascade aeration. Sludge is dewatered on beds using polymers.
4952
.98
04-DEC-2024 08:55AM

Other DWR permits at this site

Permit Documents

View
Engineering Report16-0419 Cover Letter and Fee Calc31-MAY-2016
Letter16-0419 Plan Approval Letter15-JUN-2016
Engineering Report16-0419 RCVD VIA EMAIL 11-MAY-16: 2 Reports for De-nitrification: 1) PER, 2015 CBDG WWTP IMPROVEMENTS, 2) ER, 2016, WWTP MODS; Both by GRW Engineers.11-MAY-2016
Letter18.0360 Approval Letter08-JUN-2018
Engineering Calculations18.0360 engineering calculations31-MAY-2018
Letter18.0360R Approval26-SEP-2018
Letter18.0360R Letter from ECD requiring TDEC approval of scope of work change25-SEP-2018
Letter18.0360R Notification of Revision to Plans subsequent to their approval by TDEC; The change in scope deletes the anoxic basin and related piping25-SEP-2018
Letter20.0082 Approval letter18-MAR-2020
Form20.0082 CN-1457 Wastewater20-FEB-2020
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetter3/25/2019Active59

Inspections

30-SEP-2024Pretreatment Compliance (oversight)In Compliance
30-SEP-2024Compliance Eval (non-sampling) (CEI)In Compliance
25-OCT-2023Pretreatment AuditOut of Compliance
15-APR-2022Pretreatment TAV and File ReviewIn Compliance
27-JAN-2022Compliance AssistanceIn Compliance
04-APR-2021Pretreatment Compliance (oversight)In Compliance
10-MAR-2020Pretreatment TAV and File ReviewIn Compliance
22-APR-2019Pretreatment Compliance (oversight)In Compliance
20-JUN-2018Pretreatment AuditOut of Compliance
13-APR-2018Sanitary Sewer Overflow Non-SamplingIn Compliance

Wastewater Engineering Plans Review

24.0214Pending-MJB3/26/20247/12/2024Standard Wastewater Collection System Specificationsd
23.0784PendingCDMJT12/13/20232/12/20242022 Sanitary Sewer Rehabilitation
22.0100ApprovedCDShannon Mc2/24/20223/4/2022Oneida 2021 ARC Sanitary Sewer Rehabilitation
21.0041ApprovedCDTNH2/10/20212/24/2021Bear Creek Road Apartments Sewer Line Extension
20.0760ApprovedCDRGO12/17/20201/3/20212020 ARC Sanitary Sewer Rehabilitation
20.0082ApprovedCDA. Bahour3/18/20203/18/2020Oneida Relocation
18.0360ApprovedSTPUPGRWDM5/31/20186/7/20182017 Wastewater Treatment Plant Modifications
16.0419ApprovedSTPUPGRWDM5/31/20166/14/20162015 CDBG WWTP
04.0081ApprovedSTDSPECPhil Simmo1/26/20041/26/2004STD SPECS