Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
5168
Springfield Water and Wastewater Department - Wastewater Treatment Plant
2705 Lawrence Lane
Springfield
Robertson
Nashville
Permit Information
Permit Number
TN0024961
Permit Type
Individual
Status
Reissuance
Permittee Name
City of Springfield
Project Name
Springfield STP
Activity Description
Treatment of municipal sewage; Reissue with expanded design capacity proposes to replace the 38 year-old, 3.44 MGD, extended aeration activated sludge process with a 7.0 MGD, 4-basin, sequencing batch reactor process, effluent equalization, disc filtration and ultraviolet light disinfecting to maintain existing loadings of oxygen-demanding pollutants and realize higher levels of nutrient removal. Incidental degradation that may still result in spite of the higher level of treatment will not result in pollution and is justified to support area-wide residential and industrial growth.
Permit Rating
M
Facility Classification
M
Discharge Code
MW
Application Received
21-JUN-2024
Application Returned
Application Complete
17-JUL-2024
Public Notice Date
29-OCT-2024
Issuance Date
10-DEC-2024
Effective Date
01-JAN-2025
Expiration Date
31-DEC-2029
Modification Date
Termination Date
Receiving Stream
Sulphur Fork Creek at mile 23.2 (current 3.44 MGD POTW); Confluence of Carr Creek at mile 0 and Sulphur Fork Creek at mile 23.0 (future 7.0 MGD POTW)
Effluent Description
treated municipal wastewater from Outfall 001 (both the existing and new outfall replacing it)
Treatment Description
Extended aeration activated sludge preceded by screening and grit removal and followed by ultraviolet disinfecting and oxygenation. Sludge is digested for either belt press dewatering or land application.
SIC Code
4952
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
7
Record Last Updated
23-DEC-2024 09:40AM
Other DWR permits at this site
Go
Actions
1 - 4 of 4
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
NR2304.044
City of Springfield
City of Springfield WWTP
ARAP
Active
N/A
Nashville
-
02-MAR-2023
07-APR-2025
TNB024961
Springfield STP
-
Biosolids
Active
N/A
Nashville
06-MAR-2018
06-MAR-2018
30-APR-2019
TNR056426
Springfield Wastewater Treatment Plant
-
TMSP
Active
N/A
Nashville
19-JUL-2020
20-JUL-2020
30-JUN-2025
NRS14.299
Springfield Water and Wastewater Department
Beans Cave Sewer Repair at Unnamed Tributary to Sulphur Fork Creek
ARAP
Inactive
N/A
Nashville
-
-
30-JUN-2015
1 - 4 of 4
Column Actions
Search
Permit Documents
Search All Documents
View Permit
FileNet Documents
View
File Type
Description
Document Date
Letter
Approval letter for 16-0093
10-MAY-2016
Letter
City Reply to Audit Inspection NOV
10-OCT-2018
Letter
city reply to EPA=- answering question about extensions request
01-JUL-2019
Letter
15-0512 (Old Greenbrier Pike Sewer Ext.)
19-AUG-2021
Letter
15-0776 Plans Approval by SRF
19-AUG-2021
Letter
15-0776; SRF Review Memo; Springfield Overflow Abatement Pro;. Phase 4
19-AUG-2021
Email
15-0776_Response from design engineer to DWR technical review comments
13-FEB-2020
Report
15-OCT-18 Release Report, 109 21st Ave. Manufactured Overflow Point
15-OCT-2018
Report
15-OCT-18, Overflow Report, 3rd Ave MH 5-G1 & 5-G2, entered Stormdrain
22-AUG-2018
Letter
15.0512 Approval Extension to November 2018
03-JAN-2018
row(s) 1 - 10 of 353
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Moratorium
Problem
Mechanism
Result
Action Date
Status
Percent Annual I I
Watch List
75
Inspections
Inspection Date
Type
Result
24-SEP-2024
Pretreatment Compliance (oversight)
In Compliance
29-MAY-2024
Compliance Eval (non-sampling) (CEI)
In Compliance
21-JUN-2023
Pretreatment Audit
In Compliance
14-FEB-2022
Compliance Biomonitoring (CBI)
In Compliance
25-AUG-2021
Pretreatment Compliance (oversight)
In Compliance
20-AUG-2020
Compliance Eval (non-sampling) (CEI)
In Compliance
18-SEP-2019
Pretreatment Compliance (oversight)
In Compliance
02-AUG-2018
Pretreatment Audit
Out of Compliance
12-JUN-2018
Compliance Sampling (CSI)
Out of Compliance
30-AUG-2017
Pretreatment TAV and File Review
In Compliance
row(s) 1 - 10 of 29
Next
Wastewater Engineering Plans Review
Project no
Plans Status
Type
Reviewer
Date Received
Approved Date
Project Name
24.0810
Pending
CD
MJB
12/19/2024
-
Wartrace Creek Interceptor
24.0849
Pending
CD
RGO
11/18/2024
11/26/2024
Legacy Section 7 Sewer Extension
24.0671
Pending
CD
RGO
8/28/2024
9/3/2024
Shoppes at Mooreland - Sewerline Plans
24.0448
Pending
CD
MJT
6/6/2024
8/16/2024
Summit View Subdivision
24.0381
Pending
CD
TNH
5/16/2024
6/12/2024
Highland Estates
24.0209
Pending
CD
JKM
3/25/2024
5/17/2024
Jasper Fields Subdivision
23.0610
Pending
CD
MJB
10/23/2023
12/8/2023
Low Pressure Sewer Design of Dorris Street Residential
23.0142
Pending
CD
A. Bahour
3/16/2023
4/25/2023
Memorial Mansions Townhomes
23.0137
Pending
CD
TNH
3/14/2023
5/8/2023
Lahr Road Residential Condos
22.0654
Pending
CD
A. Bahour
10/17/2022
11/17/2022
22nd Ave Townhomes
row(s) 1 - 10 of 70
Next