Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5138AUB-Oostanaula Creek STP220 Alford StreetAthensMcMinnChattanooga

Permit Information

TN0024201
Individual
Reissuance
Athens Utilities Board (AUB)
Oostanuala STP
Treatment of municipal wastewater at the Oostanaula STP via extended aeration activated sludge with disinfecting by ultraviolet light
M
M
MW
04-APR-2022
04-APR-2022
16-AUG-2022
21-SEP-2022
01-NOV-2022
31-OCT-2027
Oostanaula Creek Mile 30.1
treated municipal wastewater from Outfall 001
Treated municipal wastewater from Outfall 001
4952
6
31-OCT-2024 10:35AM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB024201AUB Oostanaula Creek STP-BiosolidsExceptional QualityN/AChattanooga---
TNR056424Athens - Oostanaula Creek Wastewater Treatment Plant-TMSPActiveN/AChattanooga19-JUL-202020-JUL-202030-JUN-2025
TNR110371Athens Utilities Board-CGPInactiveN/AChattanooga---
  • 1 - 3 of 3

Permit Documents

View
Email Industrial Waste Survey_15-JUN-2020
Report Temperature & Precipitation Report - May 2019 04-JUN-2019
Letter17.0757 Approval letter28-NOV-2017
Environmental Review17.0757 Information01-NOV-2017
Letter18.0114 Plans approval letter07-MAR-2018
Letter18.0114R Approval Letter; Tellico Hills Phase 2 Change Order Adding Zone 2108-JAN-2019
Engineering Drawings-Plans18.0114R Cover Memo and Design Calculations for 2017 CDBG Tellico Hills Low Pressure Sewer Change Order to Add Zone 2125-OCT-2018
Letter18.0851 Addenda No. 1 and No. 2 DWR Review Letter12-MAR-2019
Engineering Specifications18.0851 Addendum No 106-MAR-2019
Engineering Specifications18.0851 Addendum No. 206-MAR-2019
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Overflows:WWTP OverloadCommissioner's OrderVerified with EFO and through a look at reported data in ICIS they are not under a moratorium. The orders that put them under a moratorium were issued in the 80's and 90s and are closed.Closed45

Inspections

02-DEC-2024Pretreatment TAV and File ReviewIn Compliance
26-APR-2024Pretreatment TAV and File ReviewIn Compliance
28-AUG-2023Sanitary Sewer SystemIn Compliance
08-MAR-2023Pretreatment Compliance (oversight)In Compliance
08-FEB-2022Pretreatment AuditIn Compliance
24-AUG-2021Compliance Eval (non-sampling) (CEI)In Compliance
11-FEB-2021Pretreatment TAV and File ReviewIn Compliance
23-JUN-2020Pretreatment Compliance (oversight)In Compliance
24-SEP-2019Compliance Eval (non-sampling) (CEI)In Compliance
11-MAR-2019Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0028PendingCDTNH1/9/20244/18/2024Minisystem 1 Phase 6 Grinder Pump Project
23.0232PendingCDA. Bahour5/4/20235/31/2023Mini-System 1 Phase 5 Grinder Pump Project
23.0150PendingCDMJB3/20/20234/19/2023Davis Place
23.0074PendingCDMJB2/10/20236/15/2023Lonnie Hood - Co Rd 213 Subdivision - SEWER
23.0055PendingCDA. Bahour1/30/20232/17/2023Co Rd 703 - 2" HDPE sewer Force Main Extension
22.0415ApprovedCDA. Bahour8/16/20229/12/2022E. Harper Johnson Area Pressurized Sewer Rehab
22.0172ApprovedCDTNH3/23/20224/11/2022Sanders Road 2" Sewer Force Main Extension
21.0317RReview CompleteCDTNH3/7/2022-SRF Athens Utility Board Sewer System Improvements Revised
21.0597ApprovedCDMJB8/3/20219/1/2021Sky Ridge Subdivision Sewer Extension (56 lots)
21.0487ApprovedCDMJB6/21/20217/13/2021Willet, Wilburn, & Shady Dr. LP SS Force Main Installation