Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5749Munford Sewer Department LagoonMunford LagoonMunfordTiptonMemphis

Permit Information

TN0062499
Individual
Modification
City of Munford
Munford Sewer Department Lagoon
Treatment of municipal sewage; Modification adds limits for a proposed expansion of the lagoon from 2.0 MGD to 3.0 MGD. Munford has determined that an increase in 1.0 MGD will be less than de minimis degradation of the river because of the river's size; The upgrade may warrant replacement of the outfall line.
M
M
MW
01-APR-2024
25-MAR-2024
17-MAY-2024
02-JUL-2024
14-AUG-2024
01-SEP-2024
31-DEC-2025
14-AUG-2024
Mississippi River at mile 761
treated municipal wastewater from Outfall 001 from a lagoon with chlorine disinfecting serving Munford and the Towns of Atoka and Brighton
lagoon system (exempt from 503)
4952
2
22-AUG-2024 07:32AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR155687City of MunfordWastewater Treatment Plant ExpansionCGPActiveN/AMemphis-24-OCT-2024-
TNB062499Munford STP-BiosolidsInactiveN/AMemphis---
  • 1 - 2 of 2

Permit Documents

View
LetterWPN 23.0449 Extension Letter 10.24.202424-OCT-2024
LetterThe Division explaining why permit expiration date can not exceed 5 years based on unrelated modiciation action22-AUG-2024
LetterThe city is requesting that modified permit extends the expiration date until Decemebr 31, 202921-AUG-2024
PermitFinal Modified Permit; Encompasses Design Flow Increase from 2 to 3 MGD14-AUG-2024
Public Notice DocumentRCVD 09-SEP-24: public notice doc re: invoice, affidavit and tearsheet from 11-Jul-24 from Covington Leader11-JUL-2024
Draft PermitDraft modified permit to expand from 2.0 to 3.0 MGD02-JUL-2024
LetterNotice of Complete Application with Sign Posting Requirements01-JUL-2024
ApplicationApplication with Construction Date Clarifications28-MAR-2024
LetterNotice of Incomplete Application25-MAR-2024
LetterWPN 18.0094R Extension Letter 03.05.202405-MAR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

24-OCT-2022Performance Audit (PAI)In Compliance
03-OCT-2022Sanitary Sewer SystemIn Compliance
13-NOV-2020Compliance Eval (non-sampling) (CEI)In Compliance
23-MAY-2019Compliance Eval (non-sampling) (CEI)In Compliance
01-FEB-2017Compliance Eval (non-sampling) (CEI)In Compliance
01-FEB-2017Sanitary Sewer Overflow Non-SamplingIn Compliance
11-MAR-2015Compliance Eval (non-sampling) (CEI)In Compliance
06-FEB-2013Compliance Eval (non-sampling) (CEI)In Compliance
08-MAR-2011Compliance Eval (non-sampling) (CEI)In Compliance
27-APR-2009Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

23.0493ADDInactivePERTNH8/8/2024-Munford/Tri-Cities WWTP Expansion - Project No. 23.0493
24.0231Review CompletePERTNH4/1/2024-Wastewater Treatment Expansion
23.0449ApprovedCDTNH10/25/202311/21/2023Bell Park Subdivision
23.0493Review CompletePERTNH9/1/202312/11/2023Wastewater Treatment Expansion
18.0094RApprovedCDMJB6/9/20236/20/2023Villages of Green Meadows Phase 3
22.0328ApprovedCDA. Bahour8/22/20228/31/2022Villages of Green Meadows Subdivision 4A
22.0083Review CompleteCDTNH2/28/2022-SRF Giltedge Road
21.0647ApprovedCDMNU11/9/202111/9/2021Walker Meadows North
21.0695Review CompleteCDTNH9/27/202110/8/2021SRF Munford Lagoon Influent Pump Upgrade
21.0382ApprovedCDMNU5/12/20216/7/2021Glenview Estates Section D