Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
20548Arrington Vineyards6211 PATTON RDARRINGTONWilliamsonNashville

Permit Information

SOP-11022
SOP
Reissuance
Arrington Vineyards
Domestic wastewater and winery waste to septic tank, (2) moving bed bioreactors (MBBR) with a Bioclere unit, UV disinfection, odor reduction and 0.65 acre drip irrigation (fenced)
N/A
X
DI
16-MAR-2022
25-APR-2022
26-APR-2022
28-JUN-2022
28-JUN-2022
30-NOV-2026
N/A
No discharge allowed from this system
Septic tank, effluent collection system, recirculating media filter, UV disinfection and 0.65 acre drip irrigation (fenced)
.003204
29-MAY-2024 01:55PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR245095Arrington Vineyards, LLCArrington Vineyards Parking AdditionCGPActiveN/ANashville-09-JUN-202130-SEP-2026
TNR143928Firefly Vineyards-CGPInactiveN/ANashville-23-JUN-2006-
  • 1 - 2 of 2

Permit Documents

View
LetterRCVD VIA EMAIL 05-MAR-12: letter re: rqst for minor mod by Jeff Cox.05-MAR-2012
LetterArrington Vineyard's STEP System Design (Rural Retreat) Wastewater Collection, Treatment, and Subsurface Drip Dispersal Williamson County, TN SOP-11022 WPC 12-001230-NOV-2012
Notice of ViolationSOP-11022_Arrington_Late_Application_NOV19-JUL-2016
ApplicationArrington Vineyards SOP 11022 Renewal 2016 Application25-JUL-2016
FormRCVD 27-JUL-16: form re: ck# 35467 for $500 by John Russell.27-JUL-2016
ApplicationSOP-11022 Application with correct signature29-JUL-2016
MemoSOP-11022 UIC Approval08-AUG-2016
LetterSOP-11022_Arrington_Notice_of_Complete_Application09-SEP-2016
Draft PermitSOP-11022_Arrington_Draft_Drip_Irrigation_Permit (P/N Sep 12, 2016)13-SEP-2016
Old PermitSOP Permit13-OCT-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

05-AUG-2016Compliance Evaluations (non-NPDES)In Compliance
11-JAN-2024Compliance Evaluations (non-NPDES)Out of Compliance
28-AUG-2024Compliance Evaluations (non-NPDES)Out of Compliance

Wastewater Engineering Plans Review

12.0012ApprovedRSFDIA. Bahour1/11/20121/31/2012Arrington Vineyard