Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5006Newport STP465 Lisega Blvd. (mailing P.O. Box 519, Newport, TN 37822)NewportCockeKnoxville

Permit Information

TN0020702
Individual
Reissuance
City of Newport
Newport STP
Equalization, blending/selector system, activated sludge, ammonia/nitrogen removal, filtration, chlorination, dechlorination, and reaeration
M
M
MW
16-JAN-2020
13-JAN-2020
16-JAN-2020
18-FEB-2020
01-APR-2020
01-MAY-2020
31-MAR-2025
Pigeon River Mile 4.0
treated municipal wastewater from Outfall 001
equalization, activated sludge, ammonia stripping, filtration, chlorination, reaeration, aerobic sludge digestion, belt press dewatering, sludge drying
4952
4.35
08-JUL-2024 03:41PM

Other DWR permits at this site

Permit Documents

View
Inspection ReportPretreatment TAV 03 19 202430-JUL-2024
ReportMOR June 2415-JUL-2024
LetterPT LL Daily Max Final Approval11-JUL-2024
LetterWPN24.0421 ARP Memo 2024062424-JUN-2024
ReportMOR May 2417-JUN-2024
ReportMOR May 2411-JUN-2024
LetterPT PC/LL Final Approval20-MAY-2024
ReportMOR April 2413-MAY-2024
Letter24.0046 Approval letter 2024042929-APR-2024
LetterWPN 23.0016 Extension Letter 04.11.202411-APR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

19-MAR-2024Pretreatment TAV and File ReviewIn Compliance
05-OCT-2023Compliance Eval (non-sampling) (CEI)In Compliance
04-JAN-2023Pretreatment Compliance (oversight)In Compliance
18-AUG-2022Pretreatment AuditIn Compliance
09-MAR-2022Compliance Eval (non-sampling) (CEI)In Compliance
11-JAN-2021Pretreatment TAV and File ReviewIn Compliance
08-OCT-2020Compliance Eval (non-sampling) (CEI)In Compliance
18-MAR-2020Pretreatment Compliance (oversight)In Compliance
22-MAY-2019Pretreatment TAV and File ReviewIn Compliance
29-MAR-2019Sanitary Sewer Overflow Non-SamplingIn Compliance

Wastewater Engineering Plans Review

24.0421Review CompletePERTNH5/28/20246/24/2024PER - Interstate-40 Sanitary Sewer Extension
24.0046ApprovedCDMJB4/24/20244/29/2024Thinwood Drive Low Pressure Sewer Pump Station and Force Main
23.0016ApprovedCDCourtlandV3/30/20233/31/202324-In Gravity Sewer Improvements
23.0116ApprovedCDMJB3/1/20236/15/2023Industrial Road Pump Station and Force main Improvements
23.0052ApprovedCDTNH1/26/20232/10/2023NEWPORT UTILITIES SR 25-70 PUMP STATION AND FORCE MAIN
22.0557ApprovedCDTNH9/26/20229/30/2022Newport Wastewater Treatment Plant - Plant Drainage Lift Station Replacement
22.0606Inactive-TNH9/23/2022-State Route 25-70 Pump Station And Force Main
21.0522ApprovedCDTNH10/8/202110/20/2021Rankin Hill Road
20.0681ApprovedCDTNH1/11/20211/12/2021Incredible Tiny Homes - The Beach & Prairie
20.0557ApprovedCDAWJ11/5/202011/20/2020EPA SEP: Odell Road Low Pressure Sewer