Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
154529PIN 105360.01 PE# 68001-1250-94SR-13 at LM 28.33LobelvillePerryColumbia

Permit Information

NRS20.202
ARAP
Construction and Removal of Minor Road Crossings
Active
Tennessee Department of Transportation (TDOT)
PIN 105360.01, PE # 68001-1250-94
Removal of 31-foot bridge and installation of a 45-foot bridge over the Buffalo River at LM 28.33 with 66 linear feet of bank stabilization along the right bank and 59 linear feet of bank stabilization along the left bank
I
07-AUG-2024
18-JUN-2024
19-AUG-2024
16-OCT-2020
19-AUG-2024
07-APR-2025
Buffalo River
19-AUG-2024 04:48PM

Other DWR permits at this site

  • 1 - 1 of 1
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR192037Tennessee Department of Transportation (TDOT)SR-13 Bridge over Buffalo River (LM 28.33); CNV066; PIN 105360.01; PROJ# 68001-1250-94CGPActiveN/AColumbia-13-JUL-202130-SEP-2026
  • 1 - 1 of 1

Permit Documents

View
Addendum14 PIN 105360.01 - Hydraulic Study Email14-AUG-2020
Addendum05 PIN 105360.01 - Feature Impact Tables14-AUG-2020
Addendum10.b PIN 105360.01 - USFWS14-AUG-2020
Addendum10.c PIN 105360.01 - TWRA14-AUG-2020
Addendum10.e PIN 105360.01 - TDEC Stream Verification14-AUG-2020
Addendum10.f PIN 105360.01 - Bridge BA - January 201714-AUG-2020
Addendum10.g PIN 105360.01 - BO 2017.06.1214-AUG-2020
Addendum10.h PIN 105360.01 - Correspondence about TDEC-DNA14-AUG-2020
Addendum11 PIN 105360.01 - NEPA D-List Packet Documents14-AUG-2020
Addendum11.a PIN 105360.01 - Combined Cultural Resources14-AUG-2020
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

no data found