Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
4912
Smyrna STP
100 Jack Hunter Drive
Smyrna
Rutherford
Nashville
Permit Information
Permit Number
TN0020541
Permit Type
Individual
Status
Reissuance
Permittee Name
Town of Smyrna
Project Name
Smyrna STP
Activity Description
Discharge of treated municipal wastewater by aerated activated sludge plant with UV disinfection; Reissuance imposes limits for existing 5.85 MGD facility as well as proposed increase to 9.0 MGD. The applicant will maintain existing loads to minimize degradation with incidental degradation justified by social and economic benefit.
Permit Rating
M
Facility Classification
M
Discharge Code
MW
Application Received
11-AUG-2021
Application Returned
11-AUG-2021
Application Complete
12-AUG-2021
Public Notice Date
14-SEP-2021
Issuance Date
19-OCT-2021
Effective Date
01-DEC-2021
Expiration Date
30-NOV-2026
Modification Date
30-SEP-2009
Termination Date
Receiving Stream
Stewart Creek at mile 5.65
Effluent Description
treated municipal wastewater from Outfall 001 and distribution of treated municipal wastewater for non-potable reuse in irrigation.
Treatment Description
Aerated activated sludge plant with UV disinfection. Reuse water system to go on line 6/2011. WAS to thickner to aerob dig to belt press to landfill.
SIC Code
4952
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
5.85
Record Last Updated
18-NOV-2024 10:35AM
Other DWR permits at this site
Go
Actions
1 - 2 of 2
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
TNB020541
Smyrna STP
-
Biosolids
Active
N/A
Nashville
08-JAN-2020
08-JAN-2020
15-AUG-2024
TNR242658
Town of Smyrna
2018 Wastewater Treatment Plant Expansion
CGP
Inactive
N/A
Nashville
-
25-JUN-2018
30-SEP-2026
1 - 2 of 2
Column Actions
Search
Permit Documents
Search All Documents
View Permit
FileNet Documents
View
File Type
Description
Document Date
Report
REF 18-APR-95: report re: stream modeling by Carole Freeman.
18-APR-1995
Email
REF 21-AUG-01: email re: comments on Draft by Connie Kagey w/ notes.
21-AUG-2001
Report
REF 10-OCT-01: report re: stream modeling by TDEC.
10-OCT-2001
Report
REF 10-OCT-01: report re: stream modeling by TDEC.
10-OCT-2001
Email
REF 16-OCT-01: email re: response to Connie Kagey's comments on Draft by Maybelle Sparks.
16-OCT-2001
Public Notice Document
REF 21-MAY-07: public notice by TDEC.
21-MAY-2007
Report
REF 07-APR-08: report re: DMR summary by TDEC.
07-APR-2008
Report
REF 08-DEC-08: report re: design capacity meeting by Wade Murphy.
08-DEC-2008
Public Notice Document
REF 25-JUL-11: public notice by TDEC.
25-JUL-2011
Letter
May 2012 Pretreatment Compliance Follow-Up Inspection
26-JUL-2012
row(s) 1 - 10 of 582
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Moratorium
Problem
Mechanism
Result
Action Date
Status
Percent Annual I I
Watch List
24
Inspections
Inspection Date
Type
Result
04-OCT-2023
Pretreatment Compliance (oversight)
In Compliance
03-FEB-2023
Compliance Sampling (CSI)
In Compliance
07-OCT-2022
Pretreatment TAV and File Review
In Compliance
20-OCT-2021
Pretreatment Compliance (oversight)
In Compliance
24-MAR-2021
Compliance Eval (non-sampling) (CEI)
Out of Compliance
13-JAN-2021
Pretreatment Audit
In Compliance
03-DEC-2019
Pretreatment TAV and File Review
In Compliance
19-DEC-2018
Pretreatment Compliance (oversight)
In Compliance
17-OCT-2018
Compliance Eval (non-sampling) (CEI)
Immediately Corrected During Inspection
15-MAR-2018
Pretreatment TAV and File Review
In Compliance
row(s) 1 - 10 of 28
Next
Wastewater Engineering Plans Review
Project no
Plans Status
Type
Reviewer
Date Received
Approved Date
Project Name
24.0892
Approved
CD
RGO
12/6/2024
12/11/2024
Talia Trace Sec 2
24.0633
Approved
CD
MJB
9/13/2024
9/16/2024
Villagewood Sewer
24.0618
Approved
CD
TNH
8/10/2024
9/17/2024
Basin A Sewer Rehabilitation Phase 2
24.0491
Approved
CD
MJT
6/21/2024
7/26/2024
Greystone Sewer, Phase 1B, Section 2
24.0490
Approved
CD
MJT
6/21/2024
7/26/2024
Greystone, Phase 1B, Section 1
24.0466
Approved
CD
RGO
6/13/2024
6/26/2024
Blair Ridge Offsite Sewer
24.0404
Approved
CD
RGO
5/21/2024
5/23/2024
Redbird Farm Lane Sewer
24.0390
Approved
CD
RGO
5/17/2024
5/20/2024
Correa Subdivision
24.0379
Approved
CD
RGO
5/16/2024
5/21/2024
The Courtyards at Stewarts Creek, Phase 2
24.0319
Approved
CD
TNH
4/26/2024
5/24/2024
Basin A Sewer Rehabilitation Phase 1
row(s) 1 - 10 of 227