Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
2264City of RidgetopRidgetopRidgetopRobertsonNashville

Permit Information

SOP-97019
SOP
Reissuance
City of Ridgetop
STEP collection system from Goodlettsville to Nashville Dry Creek STP
N/A
M
CS
12-DEC-2022
04-JAN-2023
23-MAY-2023
26-JUN-2023
01-SEP-2023
31-AUG-2028
N/A
No discharge allowed
STEP sewage collection system to the Goodlettsville sewage collection system to Nashville Dry Creek STP
.01
26-JUN-2023 08:35PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
LetterWPN24.0180 Approval Letter 2024041515-APR-2024
MemoWPN24.0276 ARP Memo 2024041515-APR-2024
PermitFinal Permit 202326-JUN-2023
Draft PermitDraft SOP Permit23-MAY-2023
ApplicationRCVD VIA EMAIL 12-DEC-22: SOP app by Tim Shaw12-DEC-2022
Letter22.0405 Approval letter 2022072222-JUL-2022
Letter22.0405 - Utility Approval Letter16-JUN-2022
Form22.0405 - Plans Review Worksheet16-JUN-2022
Emailread receipt from MAyor re NOV15-JUN-2022
Notice of ViolationNOV to Ridgetop and Bobby Luttrell and Sons LLC . for creating a cross-connection in the WHUD water system13-JUN-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterMoratorium based on chronic overflows at the end of the system, I/I issues. Closed effective March 26, 2020. Authorized through Engineering section. Overflows corrected.6/27/2019Closed

Inspections

15-FEB-2019Compliance Evaluations (non-NPDES)Out of Compliance
12-NOV-2013Compliance Evaluations (non-NPDES)NOV
18-AUG-2011Compliance Evaluations (non-NPDES)NOV
20-DEC-2007Compliance Evaluations (non-NPDES)NOV

Wastewater Engineering Plans Review

24.0276Review CompletePERTNH4/12/20244/15/2024Ridgetop ARP Rehabilitation
24.0180PendingCDTNH3/8/20244/15/2024I&I Reduction / Sewer Rehabilitation
22.0405ApprovedCDMJB7/14/20227/22/2022Lake Road Sewer Extension
21.0254ApprovedCDTNH3/24/20214/9/2021Highland Ave Sewer Extension
21.0088ApprovedCDMNU3/4/20213/9/2021Browning Estates
20.0569ApprovedCDMJB9/17/20209/18/2020Barwood Drive Sewer Extension
20.0363ApprovedCDMJB7/16/20207/16/2020Woodruff Ave Sewer Extension
19.0734Review CompleteotherJAH11/13/2019-Ridgetop Sewer system ARV Installation
15.0303ApprovedLPCSA. Bahour6/22/20156/26/2015Ridgetop Station S/D, Phase 2
15.0224ApprovedLPCSA. Bahour5/15/20155/19/2015Barwood LPS Expansion