Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5821Bridgestone Americas Tire Operations, LLC dba Warren Plant725 Bridgestone DrMorrisonWarrenCookeville

Permit Information

TN0064629
Individual
Modification
Bridgestone Americas Tire Operations, LLC
Warren County Facility
Manufacturing of truck and bus radial tires from natural and synthetic rubber, carbon black, various pigments and steel cord. Proposed facility expansion accommodated through permit modification, allowing for proportional increase of pollutant loading per federal Effluent Limitation Guidelines. Corresponding socio-economic justification for proposed degradation provided with the modification request.
I
P
NCCW, CCW, NPW
06-NOV-2024
14-OCT-2024
07-NOV-2024
19-NOV-2024
10-NOV-2023
01-DEC-2023
30-JUN-2028
unnamed tributary at mile 0.1 to Plum (Crowfoot) Branch at mile 2.9
continuous boiler blowdown, boiler blowdown, softener backwash, cooling tower blowdown, air dryer drains, process oil tanks steam condensate, basement sumps, dome blowdown drain recovery tank from Outfall 001
3011
.4
07-NOV-2024 10:34AM

Other DWR permits at this site

  • 1 - 9 of 9
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR2307.103BridgestoneParking Lot ExpansionARAPTransferN/ACookeville---
TNR172540BridgestoneParking Lot ExpansionCGPActiveN/ACookeville-14-AUG-2024-
NRS23.314Bridgestone Americas Tire Operation, LLCBridgestone 3k ExpansionARAPActiveMajorCookeville30-SEP-202430-SEP-202429-SEP-2029
TNR172487Bridgestone Americas Tire OperationsBridgestone - Warren Facility 3K ExpansionCGPActiveN/ACookeville-07-JUL-202330-SEP-2026
NR2307.11Bridgestone Americas Tire Operations, LLCBridgestone Warren Facility ExpansionARAPInactiveN/ACookeville23-FEB-202323-FEB-2023-
TNR172441Bridgestone Americas Tire Operations, LLCBridgestone Americas Tire Operations Warren Parts Storage BuildingCGPInactiveN/ACookeville-02-FEB-202330-SEP-2026
TNR053210Bridgestone Americas Tire Operations, LLCBridgestone Americas Tire Operations, LLC - WarrenTMSPActiveN/ACookeville19-JUL-202020-JUL-202030-JUN-2025
TNR172439Bridgestone Warren Plant ExpansionBridgestone Warren plant ExpansionCGPInactiveN/ACookeville-23-FEB-202330-SEP-2026
TNR172516Tim Painter, Bridgestone Americas Tire Operations, Plant ManagerBridgestone - Warren Plant Railyard ImprovementsCGPInactiveN/ACookeville-08-AUG-2023-
  • 1 - 9 of 9

Permit Documents

View
EmailPictures of the Public Notice signs at our facility, placed on 11/20/2024. This email is to act as verification of complying with the requirement for public notice. 22-NOV-2024
Draft PermitDraft Permit Modification 202419-NOV-2024
EmailProposed Permit Modification - TN0064629 - Sign Requirements email with example attached07-NOV-2024
ApplicationRCVD VIA EMAIL 06-NOV-24: letter re: antideg evaluation, social and economic justification, flow characterization, and flow diagram, by Tim Painter06-NOV-2024
LetterIncomplete application letter: illegible flow diagram, partial socio-economic justification, missing analysis of designated uses protection as result of production increase14-OCT-2024
ApplicationRCVD VIA EMAIL 01-OCT-24: rqst for minor mod due to plant expansion. Cover letter, Form 1, maps, flow diagram, and sewer access approval letter from WVUD, by Tim Painter01-OCT-2024
PermitFinal NPDES Permit 202310-NOV-2023
LetterRCVD VIA EMAIL 01-NOV-23: letter re: comments on Draft by Tim Painter01-NOV-2023
Draft PermitDraft NPDES Permit 202303-OCT-2023
ApplicationRCVD VIA DOWNLOAD 06-APR-23: NPDES app by Tim Painter06-APR-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

14-JUN-2022Compliance Sampling (CSI)In Compliance
08-AUG-2019Compliance Eval (non-sampling) (CEI)In Compliance
12-AUG-2014Compliance Eval (non-sampling) (CEI)In Compliance
03-FEB-2011Compliance Eval (non-sampling) (CEI)In Compliance
03-FEB-2011Stormwater Non-Construction Non-SamplingIn Compliance
25-MAY-2007Compliance Eval (non-sampling) (CEI)In Compliance
21-MAY-2006Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0093Review CompletePPDTNH2/1/2024-Bridgestone Americas, LLC Warren Facility Expansion