Site IDSiteLocationCityCountyEFO Name
6397Pegram STP5227 Walkup RoadPegramCheathamNashville

Permit Information

TN0074586
Individual
Incomplete
Town of Pegram
Pegram STP
Septic tanks, collection system, recirculating sand filter with UV disinfection with discharge to Outfall 001 (not installed), and drip irrigation disposal (fenced) to dispose of 0.036 MGD.
I
M
MW, DI
19-JUL-2024
14-AUG-2024
04-AUG-2021
26-OCT-2021
30-NOV-2021
01-JAN-2022
31-DEC-2026
Harpeth River at mile 46.7
treated domestic wastewater from Outfall 001 and drip irrigation of treated wastewater on field below the STP site
STEP collection system, RSF (0.05 MGD); 001 - UV & discharge or 002 - drip irrigation (0.036 MGD) (fenced)
4952
.05
15-AUG-2024 07:21AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Model2001 Streeter Phelps Model05-SEP-2001
Engineering Drawings-Plans2007 As-Built Plans01-MAY-2007
Letterletter from Pegram regarding discharge to Harpeth River27-FEB-2015
Form2016 Certified Operator Form23-AUG-2016
ApplicationRCVD 14-OCT-16: NPDES app by Charles Morehead.14-OCT-2016
LetterIncomplete Application Letter21-OCT-2016
Engineering Drawings-PlansRCVD VIA DOWNLOAD 21-OCT-16: Pegram as-builts by John Gahring.21-OCT-2016
LetterRCVD 01-NOV-16: ck# 003422 for $750 by Charles Morehead.01-NOV-2016
LetterComplete Application Letter09-NOV-2016
Draft PermitDraft Permit (for 11/14/16 PN)18-NOV-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

03-JUL-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
02-JUL-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
11-JAN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
18-OCT-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
19-JUN-2018Compliance Eval (non-sampling) (CEI)Immediately Corrected During Inspection
27-OCT-2016Compliance Eval (non-sampling) (CEI)In Compliance
04-SEP-2013Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
17-NOV-2011Compliance Eval (non-sampling) (CEI)NOV
25-JUN-2009Compliance Eval (non-sampling) (CEI)NOV
24-FEB-2006Compliance Eval (non-sampling) (CEI)NOV

Wastewater Engineering Plans Review

24.0667ApprovedPP-ERRGO8/26/20249/5/2024Pegram Wastewater Treatment Facility Improvements
24.0554ApprovedPERRGO7/19/20248/20/2024Pegram Wastewater Treatment Facility Improvements
24.0477Review CompletePPDTNH6/10/2024-Pegram WWTP Improvements
22.0115ApprovedCDA. Bahour8/5/20228/5/2022The Farm at Cedar Valley
21.0811ApprovedCDA. Bahour12/6/202112/13/2021Evergreen Acres
15.0451ApprovedLINEMNU9/16/20159/17/2015Elkins Sewer Line Extension
12.0247InactiveERA. Bahour5/21/2012-SRF Recirculating Sand Filter Drip Field and Process Improvements
98.0102ApprovedRECSFSPW2/3/19984/2/1998RCSF & INTERCEPTOR FM