Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5079Lawrenceburg STP110 Ezell DriveLawrenceburgLawrenceColumbia

Permit Information

TN0022551
Individual
Reissuance
Lawrenceburg Utility Systems
Lawrenceburg STP
Treatment of municipal sewage
M
M
MW
02-JUN-2021
23-JUN-2021
21-DEC-2021
24-JAN-2022
01-FEB-2022
31-DEC-2026
Shoal Creek at mile 55.4
treated municipal wastewater from Outfall 001
Sequencing batch reactor (SBR) designed for continuous discharge with chlorine disinfecting
4952
4.5
08-JUL-2024 03:49PM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
Old Permit Final Permit 201231-OCT-2012
Report Oct 2018 PT SAR18-OCT-2018
Letter16-0353 Letter02-JUN-2016
Letter16-0353 Ref02-JUN-2016
Letter16-0852 Approval letter15-NOV-2016
Letter16-0852 Ref26-OCT-2016
Letter18.0396 Approval letter12-JUN-2018
Environmental Review18.0396 Information11-JUN-2018
Letter20.0242 Approval letter28-APR-2020
Letter20.0242 Utility Approval Letter08-APR-2020
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterNo connections that would flow into the West Point Road Pump Station5/19/2010Closed53
Chronic OverflowsLetterSelf imposed moratorium on connections that flow to West Point Pump Station2/12/2018Active
Chronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to Garner Lane.2/25/2020Active
Chronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to at Veteran's Park.2/25/2020Active
Chronic OverflowsLetterSelf imposed moratorium on connections to the collections system that ultimately flow to Old Waynesboro Highway.3/30/2022Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Simms Street. 3/26/2020Active
Watch List53

Inspections

16-MAR-2018Compliance Biomonitoring (CBI)In Compliance
13-JUL-2022Compliance Eval (non-sampling) (CEI)In Compliance
08-AUG-2019Compliance Eval (non-sampling) (CEI)In Compliance
30-JUL-2015Compliance Eval (non-sampling) (CEI)In Compliance
25-JUN-2014Compliance Eval (non-sampling) (CEI)In Compliance
10-JUL-2013Compliance Eval (non-sampling) (CEI)In Compliance
17-AUG-2010Compliance Eval (non-sampling) (CEI)NOV
28-MAY-2009Compliance Eval (non-sampling) (CEI)In Compliance
09-MAR-2007Compliance Eval (non-sampling) (CEI)In Compliance
08-JUL-2020Compliance Sampling (CSI)In Compliance

Wastewater Engineering Plans Review

22.0314Review CompleteCAP/ERRGO5/12/2022-Lawrenceburg CS- CAP
24.0476ApprovedCDRGO7/9/20247/10/2024Jackson Heights Sewer Extension
24.0193ApprovedCDRGO3/18/20243/27/2024Liberty Avenue Sewer Extension
23.0740ApprovedCDA. Bahour12/4/20231/2/2024Sanitary Sewer Extension - North Locust Avenue
23.0582ApprovedCDA. Bahour11/16/202312/14/2023Hampton Inn
23.0352ApprovedCDA. Bahour7/6/20238/4/2023Lawrenceburg Utility Systems - Standard Sewer Specifications
22.0293ApprovedCDMJB5/5/20225/17/2022North Locust Sewer Extension
21.0045ApprovedCDMNU2/16/20212/18/2021Willow Grove Subdivision
20.0572ApprovedCDA. Bahour9/22/202010/20/2020Slater Estates Subdivision
20.0544ApprovedCDMNU8/31/20209/23/2020Sanitary Sewer Extension to Gulley Subdivision