Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5174Manchester Water and Sewer Department736 West High StreetManchesterCoffeeColumbia

Permit Information

TN0025038
Individual
Reissuance
City of Manchester
Municipal POTW
Treatment of municipal sewage by extended aeration activated sludge (oxidation ditch) and UV disinfecting
M
M
MW
27-JUL-2023
19-JUL-2023
27-JUL-2023
05-DEC-2023
09-FEB-2024
01-MAR-2024
28-FEB-2029
Duck River at mile 268.5
treated municipal wastewater from Outfall 001
Oxidation ditch treatment with chlorine disinfection and dechlorination. Sludge is aerobically digested for land application.
4952
4.3
29-OCT-2024 12:20PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB025038Manchester STP-BiosolidsReissuanceN/AColumbia25-JUL-201425-JUL-201430-APR-2019
TNR181153Manchester Water and Sewer DepartmentWastewater Treatment Plant ImprovementsCGPInactiveN/AColumbia-23-NOV-2009-
  • 1 - 2 of 2

Permit Documents

View
Engineering Drawings-PlansSite Layout and Process Flow Diagram of 4.3 MGD POTW01-JUN-2007
ReportNarrative Description of 4.3 MGD POTW Design01-JUN-2007
RationaleAntidegradation Justification and Nutrient Limit Development Considerations for the 4.3 MGD POTW28-NOV-2007
Form2012 CEI EPA June15-JUN-2012
Form2013 PCI Form Jan01-FEB-2013
Inspection Report2013 PCI Jan01-FEB-2013
LetterREF 03-MAY-13: letter to Scot St. John re: approval for WPN13-0220 for FIDP for gravity sewer for MDS Foods by Phil Simmons.03-MAY-2013
LetterREF 29-MAY-13: letter to Oliver Dent re: approval for WPN13-0249 for FIDP for gravity sewer for MDS Foods by Phil Simmons.29-MAY-2013
ApplicationRCVD VIA EMAIL 01-JUL-13: NPDES app by Lonnie Norman.01-JUL-2013
FormMANCHESTER COGNIZANT OFFICIAL FORM15-JUL-2013
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole A43.4/30/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole A39.4/30/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole B49.10/2/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole I141A.5/7/2024Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole B43.5/16/2024Active
I/IPermitorder closed--reverts to permit conditions4/4/2024Watch List75

Inspections

23-FEB-2006Compliance Eval (non-sampling) (CEI)In Compliance
23-FEB-2006Pretreatment Compliance (oversight)In Compliance
10-JAN-2007Pretreatment TAV and File ReviewIn Compliance
19-SEP-2007Performance Audit (PAI)NOV
20-AUG-2008Compliance Sampling (CSI)In Compliance
17-DEC-2008Pretreatment TAV and File ReviewIn Compliance
07-OCT-2009Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
13-JAN-2010Pretreatment AuditIn Compliance
13-JAN-2011Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
13-APR-2011Pretreatment Compliance (oversight)In Compliance

Wastewater Engineering Plans Review

24.0799IncompleteCDRGO10/24/202410/30/2024Blackburn and Rogers
24.0778InactiveCDRGO10/24/1010/16/2024Basin I Sewer Rehabilitation
23.0608ApprovedCDTNH8/6/20248/8/2024Basins A, B, E, F, H, I, & K Sewer Rehabilitation
24.0395ApprovedCDRGO5/19/20245/21/2024Laurel View Residential Subdivision
23.0760Review CompletePERTNH12/5/20231/2/20242022 ARP Sewer Rehabilitation Project
23.0373ApprovedCDMJB8/21/20238/22/2023Haley Drive Townhomes
23.0247ApprovedCDMJB5/15/20236/1/2023Stonehenge Residential Development (158 lots)
23.0080ApprovedCDA. Bahour5/15/20235/16/2023Manchester Water and Sewer Standard Specifications
23.0065ApprovedCDMJB4/20/20234/28/2023Simply Southern Residential Subdivision (76 lots)
22.0528ApprovedCDA. Bahour8/17/20229/13/2022MWSD 2022 Sewer Repairs