Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5059Portland STP124 Morningside DrivePortlandSumnerNashville

Permit Information

TN0021865
Individual
Reissuance
City of Portland
Portland STP
Treatment of municipal sewage via two sequencing batch reactors (1.9 MGD) and three sequencing batch reactors in Fall 2024 (2.85 MGD) with chlorine disinfecting and dechlorination. The permittee will meet more stringent effluent limits to maintain formerly permitted loads with expanded treatment capacity. Residual biosolids are digested and land applied on approximately 400 acres.
M
M
MW
09-JUL-2024
03-JUL-2024
09-JUL-2024
16-JUL-2024
19-AUG-2024
01-SEP-2024
31-AUG-2029
Summers Branch at mile 8.6 to the Red River
treated municipal wastewater from Outfall 001
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
4952
2.85
07-NOV-2024 09:15AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR246722City of Portland, Tennessee2020 Wastewater Treatment Plant ExpansionCGPActiveN/ANashville-10-JUL-202330-SEP-2026
TNB021865Portland STP-BiosolidsIncompleteN/ANashville---
  • 1 - 2 of 2

Permit Documents

View
AddendumAppendix to NOV Response Letter; Moratorium Relief Area Map06-DEC-2020
ApplicationUPDATED VIA EMAILS 05-JUL-24 and 09-JUL-24: Form 2A by Mike Callis added to RCVD VIA DOWNLOAD 28-JUN-24: contacts, Form 2A, map, flow diagram, DMR summary, and reports by Megan Heisler09-JUL-2024
ApplicationApplication EPA Form 3510-131-MAY-2019
ApplicationAlternative analysis31-MAY-2019
ApplicationDe minimis spread sheet28-MAY-2019
ApplicationApplication EPA form 3510 2A28-MAY-2019
Draft PermitDraft Permit 2024 with Limits for Expanded Design Capacity18-JUL-2024
Draft PermitDraft Permit06-AUG-2019
EmailPT IWS Narrative Condition Satisfied02-DEC-2024
EmailPT Narrative Conditions Reminder29-OCT-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Permit ViolationsCommissioner's OrderMoratorium on Connections see Item 8 under Order & Assessment Section (page 15).4/18/2017Active58

Inspections

30-OCT-2024Pretreatment Compliance (oversight)Out of Compliance
16-AUG-2024Compliance AssistanceOut of Compliance
17-JUN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
14-JUN-2023Pretreatment TAV and File ReviewIn Compliance
18-AUG-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JUL-2022Sanitary Sewer SystemIn Compliance
02-JUN-2022Pretreatment Compliance (oversight)In Compliance
25-MAY-2021Pretreatment AuditOut of Compliance
03-MAR-2021Follow-upOut of Compliance
07-JUL-2020Compliance Eval (non-sampling) (CEI)Out of Compliance

Wastewater Engineering Plans Review

24.0227ApprovedCDMJB4/1/20245/30/2024Parkside Pointe
24.0289ApprovedCDMJB5/23/20245/23/2024Parkside Pointe SPS & Force main
24.0325ApprovedCDRGO4/30/20245/20/2024Bracken Estates - Sanitary Sewer Plans
24.0148ApprovedCDJKM2/27/20245/3/2024Harbin Sandye Avenue - Sanitary Sewer Collection Plans
24.0160ApprovedCDMJT3/1/20244/1/2024Sanitary Sewer Rehab of Portland Sudden Service
23.0747ApprovedCDTNH3/1/20243/26/2024HWY 52E No. 1 Lift Station Relocation
23.0560ApprovedCDJKM2/26/20242/28/2024Richland Estates Subdivision – Sanitary Sewer Collection Plans
24.0015ApprovedCDTNH2/2/20242/5/2024N Harris Ln Sewer Extension
23.0629ApprovedCDTNH1/29/20241/29/2024Twin Lakes
23.0350ApprovedCDTNH7/5/20237/28/2023Collins Sewer Extension