SOP-97019
SOP
Reissuance
City of Ridgetop
STEP collection system from Goodlettsville to Nashville Dry Creek STP
N/A
M
CS
12-DEC-2022
04-JAN-2023
23-MAY-2023
26-JUN-2023
01-SEP-2023
31-AUG-2028
N/A
No discharge allowed
STEP sewage collection system to the Goodlettsville sewage collection system to Nashville Dry Creek STP
.01
26-JUN-2023 08:35PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Notice of Violation12-NOV-13 CI & complaint investigation06-JAN-2014
Letter18.0371 Ex-Letter25-MAY-2021
Letter19.0734 Cover Letter13-NOV-2019
Letter19.0734 Letter from Mayor13-NOV-2019
Engineering Specifications19.0734 Ridgetop Emergency Air Release Valve Submittal22-NOV-2019
Letter20.0363 Approval letter 2020071616-JUL-2020
Form20.0363 Plans Review Fee Worksheet11-JUN-2020
Letter20.0363 Utility Approval Letter11-JUN-2020
Letter20.0569 Approval letter 2020091818-SEP-2020
Form20.0569 Fee Worksheet18-SEP-2020
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterMoratorium based on chronic overflows at the end of the system, I/I issues. Closed effective March 26, 2020. Authorized through Engineering section. Overflows corrected.6/27/2019Closed

Inspections

15-FEB-2019Compliance Evaluations (non-NPDES)Out of Compliance
12-NOV-2013Compliance Evaluations (non-NPDES)NOV
18-AUG-2011Compliance Evaluations (non-NPDES)NOV
20-DEC-2007Compliance Evaluations (non-NPDES)NOV

Wastewater Engineering Plans Review

24.0276Review CompletePERTNH4/12/20244/15/2024Ridgetop ARP Rehabilitation
24.0180PendingCDTNH3/8/20244/15/2024I&I Reduction / Sewer Rehabilitation
22.0405ApprovedCDMJB7/14/20227/22/2022Lake Road Sewer Extension
21.0254ApprovedCDTNH3/24/20214/9/2021Highland Ave Sewer Extension
21.0088ApprovedCDMNU3/4/20213/9/2021Browning Estates
20.0569ApprovedCDMJB9/17/20209/18/2020Barwood Drive Sewer Extension
20.0363ApprovedCDMJB7/16/20207/16/2020Woodruff Ave Sewer Extension
19.0734Review CompleteotherJAH11/13/2019-Ridgetop Sewer system ARV Installation
15.0303ApprovedLPCSA. Bahour6/22/20156/26/2015Ridgetop Station S/D, Phase 2
15.0224ApprovedLPCSA. Bahour5/15/20155/19/2015Barwood LPS Expansion